Browse
Search
RES-2003-070 Division 7 Resolutions Endorsing Orange County Transportation Priority List for 2006-2012 TIP
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2003
>
RES-2003-070 Division 7 Resolutions Endorsing Orange County Transportation Priority List for 2006-2012 TIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 3:52:39 PM
Creation date
8/10/2011 3:51:21 PM
Metadata
Fields
Template:
BOCC
Date
10/21/2003
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
5b
Document Relationships
Agenda - 10-21-2003-5b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 10-21-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY TRANSPORTATION PRIORITY LIST <br />2006 - 2012 TRANSPORTATION IMPROVEMENT PROGRAM <br />6. US 70 Bypass Widening: Widen, from the Orange/Durham County Line to <br />the US 70 - I-85 Connector east of Efland, US 70 Bypass to a four-lane <br />divided section with bike and pedestrian improvements. This project should <br />be phased to address traffic counts. and existing congestion. Orange County <br />requests that this project be identified as a need and included in the 2006- <br />2012 STI P. <br />7. NC 86 (North of Hillsborough) Improvements: Widen NC 86, from US 70 <br />Bypass north of Hillsborough to SR 1332, Coleman Loop (Coleman Loop also <br />being the intersection area of the planned connector between NC 86 and NC <br />57), to four lanes with intersection improvements at US 70 Bypass.. NC 86 is <br />the major north-south route through Orange County. NC 57 converges into <br />US 86 just north of US 70 Bypass. The segment of NC 86 between NC 57 <br />and US 70 is congested, rendering a high accident location at the intersection <br />of US 70 Bypass at NC 86. Development pressures in this area will <br />exacerbate traffic congestion and accident proliferation. <br />ORANGE COUNTY PROJECTS OUTSIDE <br />THE DURHAM-CHAPEL HILL-CARRBORO <br />METROPOLITAN PLANNING AREA <br />1) Buckhorn Road (SR 1114) Widening: Widen from US 70 to West Ten Road <br />(SR 1144) to a multilane facility. This stretch of roadway borders the western <br />boundary of the I-85/Buckhorn Road Economic Development District EDD). <br />This area is the focus of a growing problem of traffic backing up on the <br />northbound exit ramps of I-85 caused by northbound traffic exiting I-85 onto <br />southbound Buckhorn Road and turning left into a nonconforming business <br />use just south of the interchange. With increased interest in extending water <br />and sewer and reconsidering proposed uses within the EDD, improvements <br />to the transportation system to support plans for that district are necessary to <br />attract the desired planned development. <br />2) Park and Ride Lot in the Buckhorn Economic Development District:. Orange <br />County requests a park and ride facility (from the adopted Orange County <br />Economic Development District Design Manual) be funded in the Community <br />Transportation Improvement Plan for Orange Public Transportation. This <br />project is clearly justified, as it would provide an opportunity for coordination <br />of public transportation efforts between two growing regions in North Carolina, <br />the Triad and Triangle. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.