Browse
Search
RES-2003-070 Division 7 Resolutions Endorsing Orange County Transportation Priority List for 2006-2012 TIP
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2003
>
RES-2003-070 Division 7 Resolutions Endorsing Orange County Transportation Priority List for 2006-2012 TIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 3:52:39 PM
Creation date
8/10/2011 3:51:21 PM
Metadata
Fields
Template:
BOCC
Date
10/21/2003
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
5b
Document Relationships
Agenda - 10-21-2003-5b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 10-21-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY TRANSPORTATION PRIORITY LIST <br />2006 - 2012 TRANSPORTATION IMPROVEMENT PROGRAM <br />Chapel Hill to Hillsborough is experiencing increasing numbers of bicyclists <br />using this route and there. are also two schools along this route. This route is <br />listed as priority I of the primary bicycle routes proposed in the Orange <br />County Bicycle Transportation Plan adopted April 6, 1999. This project is <br />listed in the 2002-2008 TIP, as an incidental bicycle need. Orange County <br />requests that bicycle lanes be constructed as an independent project, and, if <br />necessary, programmed in phases. <br />4. Old NC 86 (SR 1009) Bicycle Lanes: Construct bicycle lanes (4-foot paved <br />shoulders) from Carrboro (Eubanks Road) to Hillsborough (I-40). This <br />project, from the Carrboro Transition area (Hickory Forest Road) to Lafayette <br />Drive, is priority 6 of the primary bicycle routes listed in the Orange County <br />Bicycle Transportation Plan, and would extend bicycle accommodations <br />requested in TIP Project R-2825 to Carrboro, where its Transportation <br />Advisory Committee has also established bicycle routes on Old NC 86 as a <br />transportation priority connection between proposed bicycle facilities along <br />Old Fayetteville Road, Homestead Road and Eubanks Road. <br />The feasibility study for TIP Project R-2825, improvements to South Churton <br />Street, recommends afour-lane divided section for Old NC 86 (S. Churton <br />St.) from I-40 to Lafayette Drive. That study also anticipates accommodations <br />for bicycles (wide outside lanes) from I-40 to I-85. This project would connect <br />bicycle facilities proposed in the South Churton Street project to Carrboro. <br />Carrboro's Transportation Advisory Committee has recommended bicycle <br />lanes along Old NC 86 in two separate requests for Carrboro's Priority List for <br />the 2006-2012 TIP: <br />from Old Fayetteville Road to Homestead Road; and <br />• from Homestead Road to Eubanks Road. <br />5. R-2825 Improvements to South Churton Street: .Develop congestion <br />management, limited access, aesthetic and capacity improvements between <br />US 70 Business and Interstate 40. The portion between Interstates 40 and <br />85 will conform to the design criteria of the Economic Development District <br />Design Manual (4-lane divided section with bike and pedestrian <br />improvements). The feasibility study completed in February 2002 <br />recommends a 4-lane divided, with 16-foot median, curb and gutter cross <br />section for the entire corridor from I-40 to Eno River. Orange County stresses <br />the need to study improvements within the current right-of-way for the <br />segment north of Interstate 85. Improved capacity through widening is not <br />the County's first choice because of significant constraints between Interstate <br />85 and US 70 Business and the proximity of the historic district north of the <br />project limits. Orange County requests that, where conditions do not prevent <br />the addition of frontage roads, the feasibility study include .the addition of <br />frontage roads with limited access from the corridor. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.