Browse
Search
RES-2003-068 Resolution Initiating the Project to Expand the 1997 Efland Sewer Bond Area System and to Extend Water and Sewer Utilities to Serve the Buckhorn EDD Area and Community
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2003
>
RES-2003-068 Resolution Initiating the Project to Expand the 1997 Efland Sewer Bond Area System and to Extend Water and Sewer Utilities to Serve the Buckhorn EDD Area and Community
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 3:15:48 PM
Creation date
8/10/2011 3:15:47 PM
Metadata
Fields
Template:
BOCC
Date
10/1/2003
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
9e
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. the County recognizes that providing at least the core elements of water <br />and sewer infrastructure to the EDD will help promote non-residential <br />development in the Buckhorn EDD, which will in turn help to stabilize and <br />make permanent zoning of the Buckhorn EDD; and <br />7. the County has secured a $900,000 Environmental Protection Agency <br />(EPA) grant for the construction of portions of a wastewater collection <br />system that could provide the core of wastewater utilities for the EDD and <br />could also provide wastewater collection for the Buckhorn Road <br />community and for the proposed middle school site; and <br />8. the County's EPA grant is a matching fund grant which the County will <br />match with proceeds from the 1997 Efland Sewer Bond; and <br />9. the use of the Bond funds as the match for the EPA grant requires that <br />both the bond funded project and the grant funded project be configured <br />such that system design and construction activities be carried out as two <br />sections or phases of a single project and adhere to the rules and <br />requirements of EPA funded utility projects; and <br />10. Orange County and the City of Mebane have previously cooperated to <br />provide municipal utility service to economic development areas to the <br />mutual benefit of both the City and County; and <br />11. County officials and staff have held discussions with City of Mebane <br />officials and staff about the engineering feasibility of, and the City's <br />willingness to allow, the extension of City water distribution and <br />wastewater collection utilities to the Buckhorn Road community and the <br />EDD; and <br />12. City of Mebane and Orange County officials and staff have determined <br />that extending City water distribution and wastewater collection utilities to <br />the Buckhorn Road community and the EDD is feasible and offers <br />significant benefits to the County, the City and the community; and <br />13. the County wishes to ensure that its adopted development standards for <br />the EDD and the integrity of the County Land Use Plan for the area <br />surrounding the Buckhorn Road community and the EDD remain intact <br />regardless of the availability or ownership of water and wastewater <br />utilities, and: <br />14. the County wishes to ensure that the integrity of the Efland Community is <br />not compromised and that it remain distinct from the EDD and the <br />Buckhorn Road community; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.