Browse
Search
ORD-2003-116 Amendments to Open Space Standards for Flexible Development Subdivisions
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-116 Amendments to Open Space Standards for Flexible Development Subdivisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 12:43:55 PM
Creation date
8/9/2011 11:32:37 AM
Metadata
Fields
Template:
BOCC
Date
9/16/2003
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
9c
Document Relationships
Agenda - 09-16-2003-9c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 09-16-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Respect for existing site conditions, including slope, vegetation, <br />drainage patterns, etc.; <br />d. Efficient use of the land to minimize disturbance and grading and to <br />conserve energy; <br />e. Safe and efficient vehicular and pedestrian circulation; and <br />f. Logical placement of structures and other site functions. <br />g. No open burning of trees, limbs, stumps and construction debris <br />associated with the permitted activity. <br />14.3.2 <br />Amended <br />10/7/91 <br />8/4/93 Where an application is found to be inconsistent with the above criteria, Staff <br />may recommend changes to the site plan. <br />Following review of the site plan, except as provided by Article 14.3.3 of this <br />Ordinance, the Planning and Inspections Department will take final action on <br />the application within 21 days of acceptance. Such action will be one of the <br />following: <br />a. Approval, <br />b. Approval subject to conditions, or <br />C. Denial <br />Failure to meet the criteria for site plan approval listed in Article 14.3, and /or <br />to address agency comments solicited during plan review, will result in denial <br />of the application. <br />If a plan is approved subject to conditions, no zoning permit or subsequent <br />building permit shall be issued until all conditions of approval have been met <br />to the satisfaction of Orange County. <br />Site plan approval and the issuance of a zoning compliance permit does not <br />establish a vested right to develop the property should zoning regulations <br />change subsequent to plan approval. <br />At the option of the Applicant, a Site Plan may be vested for a period of not <br />less than two (2) nor more than five (5) years. To become vested, a Site Plan <br />must be approved by the Board of County Commissioners as a Special Use <br />Permit, pursuant to Article 8 of this Ordinance. An approved Site Specific <br />Development Plan shall contain the following statement: Approval of this <br />plan establishes a zoning vested right under G.S. 153A- 344.1. Unless <br />terminated at an earlier date, the zoning right shall be valid until <br />14.3.3 The Site plan for a project which requires the preparation of an Environmental <br />Impact Statement (EIS) pursuant to the Orange County Environmental Impact <br />Ordinance may not be approved by the Planning Department until the EIS <br />has been made available for public review, and has been presented to the <br />Orange County Board of Commissioners in accordance with Section 3.2 of <br />the Environmental Impact Ordinance. <br />14 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.