Orange County NC Website
3) Existing topography at a contour interval of two (2) feet based <br />on mean sea level datum. <br />4) Land use, road system, natural features and topographical (10 <br />foot contour intervals) details for the area within 1,000 feet of <br />the perimeter of the property. <br />5) Typical cross - sections showing extent of overburden, extent of <br />sand and gravel deposits, and water table. <br />6) Proposed handling and storage areas for overburden, <br />by- products and excavated materials. <br />7) Location and results of groundwater borings showing depth of <br />groundwater. <br />8) Any areas proposed for ponding. <br />9) Wind pattern details and on -site windbreaks. <br />10) Soils details and statement addressing agricultural productivity <br />and reclamation. <br />11) Traffic impact analysis addressing the capacity of the roads to <br />serve the site. <br />12) Access roads to the site, as well as on -site roads, with <br />indication of surface treatment to limit dust. Sight distances on <br />all roads used for access to the site. <br />13) Required setback areas, including screening /buffering existing <br />and /or proposed. If plant materials are to be installed, the <br />number, location, size and type of plants are to be identified. <br />b) An Operations Plan which shall include: <br />1) The date proposed to commence operations and their expected <br />duration. <br />2) Proposed hours and days of operations. <br />3) Estimated type and volume of extraction. <br />4) Description of method of operation, including the disposition of <br />topsoil, overburden and by- products. <br />5) Methods to control and respond to spillage of extracted <br />materials, overburden or by- products and vehicular mud on <br />off -site roads. <br />6) Description of equipment to be used in the extraction process <br />8 -9 -a <br />