Browse
Search
2003 NS Housing - Sam English for Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2003
>
2003 NS Housing - Sam English for Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2012 10:43:43 AM
Creation date
8/8/2011 12:34:04 PM
Metadata
Fields
Template:
BOCC
Date
9/2/2003
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8g
Document Relationships
Agenda - 09-02-2003-8g
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 09-02-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />Sam English Page 4 <br />523 Watson Rd. <br />Efland, N.C. 27243 <br />8/11/03 <br />DEN: <br />1. Prepare the walls and ceiling for paint. Fill all damaged seams, <br />joints and nail holes with sheetrock filler. Paint the walls with <br />flat latex paint. The paint shall cover completely. <br />2. Prepare the trim for paint. Fill all nail holes. Caulk all cracks <br />and joints with latex caulk. Paint the trim with semigloss latex <br />paint. The paint shall cover completely. <br />3. Prime and spray a texture on the ceiling. <br />HALLWAY: <br />1. Prepare the walls for paint. Fill all damaged seams, joints and nail <br />holes with sheetrock filler. Paint the walls with flat latex paint. The <br />paint shall cover completely. <br />2. Prepare the ceiling for a sprayed texture. Repair all seams, nail holes, <br />and tape joints with sheetrock filler. Sand all new filler and spray a <br />texture on the ceiling. <br />3. Remove the wood stove. Repair the sheetrock where the vent flue <br />enters the chimney. Install % sheetrock and finish smooth. <br />4. Adjust the door leading to the basement. Install casing on the base- <br />ment side. Install weatherstripping and a threshold. Trim the door <br />to close properly. <br />5. Paint the doors & trim with semigloss latex paint. The paint shall <br />cover completely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.