Browse
Search
ORD-2003-107 Concurrent Amendments to Orange County Zoning Ordinance and Orange County Subdivision Regulations Regarding Subdivision Size, Location, Process, and Standards
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-107 Concurrent Amendments to Orange County Zoning Ordinance and Orange County Subdivision Regulations Regarding Subdivision Size, Location, Process, and Standards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 12:49:18 PM
Creation date
8/8/2011 11:18:10 AM
Metadata
Fields
Template:
BOCC
Date
8/25/2003
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C1a&b
Document Relationships
Agenda - 08-25-2003-c1ab
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 08-25-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CTANnARnS_ rRnWTH MANAGEMENT SYSTEM <br />R-1 & EDD ZONING IN WATER SEWER BOUNDARY URBANIZING TAN <br />SUBDIVISION <br />MAIOR <br />SUP I <br />SUP II <br />PD <br />Number of Lots <br />6 -19 <br />20 -40 <br />41 -79 <br />80+ <br />BALANCE OF ORANGE COUNTY PLANNING JURISDICTION IN WATER SEWER BOUNDARY RURAL GREEN <br />SUBDMSION <br />MA70R <br />SUP <br />construction methods that could be <br />PD <br />Number of Lots <br />6 -19 <br />20-40 <br />41+ <br />e. A plan showing how the site will be <br />protected from impacts by human <br />and unwanted animal intrusion, <br />alternate plant species and <br />construction methods that could be <br />used in the event adjustments or <br />substitutions are needed until the <br />mitigation area is established; and <br />f. A financial guarantee is required for <br />the total cost of the mitigation <br />project. Once the installation is <br />complete, thirty percent (30 %) of <br />the amount of the letter of credit or <br />escrow will be held for twelve (12) <br />months or until the site is <br />established, whichever is greater. <br />[Submittal: Report and Analysis <br />(approximately 10 pages)] <br />13. LOW IMPACT DESIGN <br />(Design booklet) <br />R <br />R <br />R <br />GS <br />I <br />II <br />II <br />Standards of Evaluation <br />The following specific standards shall be used <br />in deciding on an application for this use:. <br />A. The project meets all applicable design <br />standards and other requirements of the <br />Zoning Ordinance and the Subdivision <br />Regulations. <br />E <br />E <br />E <br />E <br />B. The project meets all service provision <br />criteria as set forth below: <br />1. Fire, <br />2. Police, <br />3. Rescue Services, <br />4. Water Supply, <br />5. Wastewater Treatment Methods. <br />R <br />R <br />R <br />R <br />
The URL can be used to link to this page
Your browser does not support the video tag.