Orange County NC Website
CTANnARnS_ rRnWTH MANAGEMENT SYSTEM <br />R-1 & EDD ZONING IN WATER SEWER BOUNDARY URBANIZING TAN <br />SUBDIVISION <br />MAIOR <br />SUP I <br />SUP II <br />PD <br />Number of Lots <br />6 -19 <br />20 -40 <br />41 -79 <br />80+ <br />BALANCE OF ORANGE COUNTY PLANNING JURISDICTION IN WATER SEWER BOUNDARY RURAL GREEN <br />SUBDMSION <br />MA70R <br />SUP <br />construction methods that could be <br />PD <br />Number of Lots <br />6 -19 <br />20-40 <br />41+ <br />e. A plan showing how the site will be <br />protected from impacts by human <br />and unwanted animal intrusion, <br />alternate plant species and <br />construction methods that could be <br />used in the event adjustments or <br />substitutions are needed until the <br />mitigation area is established; and <br />f. A financial guarantee is required for <br />the total cost of the mitigation <br />project. Once the installation is <br />complete, thirty percent (30 %) of <br />the amount of the letter of credit or <br />escrow will be held for twelve (12) <br />months or until the site is <br />established, whichever is greater. <br />[Submittal: Report and Analysis <br />(approximately 10 pages)] <br />13. LOW IMPACT DESIGN <br />(Design booklet) <br />R <br />R <br />R <br />GS <br />I <br />II <br />II <br />Standards of Evaluation <br />The following specific standards shall be used <br />in deciding on an application for this use:. <br />A. The project meets all applicable design <br />standards and other requirements of the <br />Zoning Ordinance and the Subdivision <br />Regulations. <br />E <br />E <br />E <br />E <br />B. The project meets all service provision <br />criteria as set forth below: <br />1. Fire, <br />2. Police, <br />3. Rescue Services, <br />4. Water Supply, <br />5. Wastewater Treatment Methods. <br />R <br />R <br />R <br />R <br />