Browse
Search
ORD-2003-104 - Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-104 - Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 12:51:11 PM
Creation date
8/4/2011 2:17:18 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Meeting Type
Work Session
Document Type
Ordinance
Agenda Item
1
Document Relationships
Agenda - 08-19-2003-ws1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 08-19-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARDS, GROWTH MANAGEMENT SYSTEM L9 <br />R -1 & EDD ZONING IN WATER /SEWER BOUNDARY URBANIZING TAN <br />SUBDIVISION <br />MAJOR <br />SUP I <br />SUP II <br />PD <br />Number of Lots <br />6 -19 <br />20 -40 <br />41 -79 <br />80+ <br />BALANCE OF ORANGE COUNTY PLANNING 3URISDICTION IN WATER /SEWER BOUNDARY RURAL GREEN <br />SUBDIVISION <br />MAJOR <br />SUP <br />H. Solid Waste Management <br />PD <br />Number of Lots <br />6 -19 <br />20 -40 <br />41+ <br />4. Permanent landscaping, groundcover, <br />mulch, etc. will be installed as soon as <br />practical after construction activities <br />for each phase are completed. <br />H. Solid Waste Management <br />The Solid Waste Management Plan <br />submitted as part of the Resources <br />Management Plan shall include the <br />method(s) of disposal and recycling of <br />construction debris. <br />I. Irrigation <br />1. Irrigation systems for the subdivision <br />and the lots in the subdivision are <br />designed and can be operated <br />according to a water conservation plan <br />described in the Resources <br />Management Plan submitted with the <br />application; <br />2. The Resources Management Plan shall <br />identify the source(s) of water to be <br />used for irrigation, the volume <br />available for that purpose, and <br />expected consumption rates. The <br />system design and plan for operation <br />will be evaluated based on efficiency; <br />and <br />3. Water recycled from stormwater <br />retention ponds or treated sewage <br />effluent is used for irrigation where it is <br />a legally permitted alternative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.