Browse
Search
ORD-2003-104 - Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-104 - Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 12:51:11 PM
Creation date
8/4/2011 2:17:18 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Meeting Type
Work Session
Document Type
Ordinance
Agenda Item
1
Document Relationships
Agenda - 08-19-2003-ws1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 08-19-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />that are constrained by the environment and land holding capacity and where larger scale <br />projects are incompatible with the rural setting. <br />These proposed special use subdivision regulations put forth growth controls that manage the <br />size and location of projects as well as develop additional land development performance <br />standards depending on the scale of the project. In essence, the larger the project, the more <br />complex research and analysis are necessary to ameliorate the potential impact of the project. <br />The proposal divides the subdivision approval process into five main categories depending on <br />the location and the number of lots proposed. <br />1) August 2003 proposal -- For 6 -19 lots in all zoning districts (same subdivision process <br />that is currently in effect) <br />2) Proposed Class A Special Use Permit process — For 20 -40 lots [Rural Buffer, <br />Agricultural Residential, and R1 (Outside of Primary Service Area of Water and Sewer <br />Boundary Agreement)] See Green Rural Area on Map <br />3) Proposed Class A Special Use Permit process — For 20-40 lots [R -1 and EDD (Inside of <br />Primary Service Area of Water and Sewer Boundary Agreement) Level I Analysis] See <br />Tan Urbanizing Area on Map <br />4) Proposed Class A Special Use Permit process — For 41 -79 lots [R -1 and EDD (Inside of <br />Primary Service Area of Water and Sewer Boundary Agreement) Level II Analysis See <br />Tan Urbanizing Area on Map <br />5) Proposed Planned Development (i.e. Legislative Rezoning with Quasi-judicial Special <br />Use Permit, Class A). This option is available to any property owner, who believes, by <br />merits of the project design, that a justification to rezone the property can be made. <br />Any project above 40 lots in a 'green' Rural Area (see map) and above 79 lots in a 'tan' - <br />Urbanizing Area would have the option to pursue rezoning. Rezoning would not necessarily, <br />and in most cases would not, include any change in land use density. Projects would normally <br />be filed for planned development in the rural areas based on design (reduction in lot size, type <br />of units, etc.) and whether or not the project as proposed by the developer advances the <br />County's goals in housing related areas. <br />There are currently no projects 'in the pipeline' (i.e. at Preliminary Plan submittal stage) that <br />would be required to follow either of the proposed processes. Additionally, no project has been <br />submitted for concept approval that would be required, by these proposed amendments, to <br />follow either process. <br />The attached amendments should be reviewed by the Board members prior to the August 25, <br />2003 public hearing so that pertinent questions may be asked and reflected in the official <br />minutes of the meeting. This will allow staff to perform research prior to the return of the <br />amendments to the Planning Board for a recommendation back to the BOCC. <br />Subdivision Regulation Changes: <br />A. Sets the new criteria for determining whether a proposed Preliminary subdivision is to be <br />processed as a Planned Development or a Major Subdivision Class A Special Use or under <br />existing ordinance provisions. The determining factors are location (whether inside or <br />outside of Primary Service Area of Water and Sewer Boundary Agreement) and the number <br />of lots proposed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.