Browse
Search
ORD-2003-104 Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-104 Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 9:41:20 AM
Creation date
8/4/2011 2:03:24 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Meeting Type
Work Session
Document Type
Ordinance
Agenda Item
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cTeNneRnS_ cROwTH MANAGEMENT SYSTEM <br />R-1 & EDD ZONING IN WATER/SEWER BOUNDARY URBANIZING TAN <br /> SUBDMSION MAJOR SUP I SUP II PD <br /> Number of Lots 6-19 20-40 41-79 80+ <br />BALANCE OF ORANGE COUNTY PLANNING JURISDICTION IN WATER/SEWER BOUNDARY RURAL GREEN <br /> SUBDIVISION MA]OR SUP PD <br /> Number of Lots 6-19 20-40 41+ <br />X8.29, Maior Subdivision Class A Special Use <br />8.8.291'Ai Additional Information (To be submitted for all <br />_.. <br />applications) <br />In addition to a Preliminary Plan prepared in <br />accordance with the Orange County <br />Subdivision Regulation and the information <br />required in Subsections 8.2 and 8.8, the <br />following shall be submitted as part of the <br />application: <br />1. NOTIFICATION <br />Stamped envelopes addressed to each <br />owner of property within 500 feet (radius <br />drawing) of the properly proposed to be <br />subdivided. The names and addresses of <br />properly owners shall be based on the <br />current listing as shown in the Orange <br />County Land Records system. <br />(Submittal: To be submitted on Land Records <br />letterhead with signature and date of Land <br />Record certification) R R R E <br />2. DEVELOPMENT SCHEDULE <br />The statement from the applicant <br />indicating the anticipated development <br />schedule for the build out of the project. <br />(Submittal: One-half page specifying the <br />phasing of the project and timeline for each <br />phase, if any.) R R R E <br />R Rec4irnro~nde_ ~1 '_ <br />Required GS ~balSuplSorting E i/x~stingPerNon-SIJPSvbdn-jsionR~ulahnr~s ..: <br />hcable <br />Level !Analysis C -Comment NIA -Not App <br />_ _. .. <br />Level 1 f Aria :: 1s _..._ :: _::._ _._ _......... _. _ ~ ._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.