Browse
Search
ORD-2003-104 Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-104 Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 9:41:20 AM
Creation date
8/4/2011 2:03:24 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Meeting Type
Work Session
Document Type
Ordinance
Agenda Item
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STeN~eR~s_ cROwTH McNeGEMENT SYSTEM 14 <br />R-1 & EDD ZONING IN WATER/SEWER BOUNDARY URBANIZING TAN <br /> SUBDMSION MAJOR SUP I SUP II PD <br /> Number of Lots 6-19 20-40 41-79 80+ <br />BALANCE OF ORANGE COUNTY PLANNING 7URISDICTION IN WATER/SEWER BOUNDARY RURAL GREEN <br /> SUBDIVISION MAJOR SUP PD <br /> Number of Lots 6-19 20-40 41+ <br />e. A plan showing how the site will be <br />protected from impacts by human <br />and unwanted animal intrusion, <br />alternate plant species and <br />construction methods that could be <br />used in the event adjustments or <br />substitutions are needed until the <br />mitigation area is established; and <br />f. A financial guarantee is required for <br />the total cost of the mitigation <br />project. Once the installation is <br />complete, thirty percent (30%) of <br />the amount of the letter of credit or <br />escrow will be held for twelve (12) <br />months or until the site is <br />established, whichever is greater. <br />[Submittal: Report and Analysis <br />(approximately 10 pages)] <br />13. LOW IMPACT DESIGN <br />(Design booklet) R R R <br /> GS I II II <br />8.29:2 Standards of Evaluation <br />The following specific standards shall be used <br />in deciding on an application for this use: <br />A. The project meets all applicable design <br />standards and other requirements of the <br />Zoning Ordinance and the Subdivision <br />Regulations. E E E E <br />B. The project meets all service provision <br />criteria as set forth below: <br />1. Fire, <br />2. Police, <br />3. Rescue Services, <br />4. Water Supply, <br />5: Wastewater Treatment Methods. R R R R <br />'R = f~ecommendedl `- <br />Requusc~ ' ~~,qal Supporting E =Existing Per Norr-5UP 5ubditnston Regulations <br />Level ll~181 N:::___::...._aG ~;t1[z~r~ent N/A °...Not Applicable ,-,.: <br />;_ <br />.: L~v~ell1 f~r~a sus.. ..__. <br />
The URL can be used to link to this page
Your browser does not support the video tag.