Browse
Search
ORD-2003-104 Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-104 Growth Management System - Amendments to Zoning Ordinance and Subdivision Regulations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 9:41:20 AM
Creation date
8/4/2011 2:03:24 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Meeting Type
Work Session
Document Type
Ordinance
Agenda Item
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARDS. GROWTH MANAGEMENT SYSTEM 13 <br />R-1 & EDD ZONING IN WATER/SEWER BOUNDARY URBANIZING TAN <br /> SUBDIVISION MA]OR SUP I SUP II PD <br /> Number of Lots 6-19 20-40 41-79 80+ <br />BALANCE OF ORANGE COUNTY PLANNING JURISDICTION IN WATER/SEWER BOUNDARY RURAL GREEN <br />_ SUBDMSION MA]OR SUP PD <br /> Number of Lots 6-19 20-40 41+ <br />12. ENVIRONMENTAL MITIGATION <br />A mitigation plan is required when any <br />wetland or other environmentally <br />sensitive area identified in the <br />biological inventory will be altered as a <br />result of development of the <br />subdivision or construction of homes <br />or other buildings and structures <br />associated with the subdivision. The <br />mitigation plan shall include the <br />following: <br />a. An assessment of the ecological <br />value of resources that will be lost <br />and a statement of how that value <br />will be replaced through mitigation; <br />b. A specific statement of the goals <br />and objectives, i.e., exactly what <br />steps will be taken to compensate <br />for lost habitat, etc.; <br />c. Detailed descriptions in the form of <br />grading plans, construction plans, <br />and .planting plans to illustrate how <br />the objectives will be carried out; <br />d. A monitoring and maintenance plan <br />to measure success of the <br />mitigation based on stated <br />objectives. Include a list of parties <br />responsible for monitoring and <br />maintenance, a schedule for each, <br />and how results will be reported to <br />the Planning and Inspections R R <br />Department; GS GS I II <br />Requiret3 ' ~ GS =Goal Supporting I E =Exi53ingiPerNon-SUP Subdivision Regulations I <br />Level 1 Anal~srs C =Comment NIA = Nof Applicable <br />I pval I~ ~ra~l..c.c <br />
The URL can be used to link to this page
Your browser does not support the video tag.