Browse
Search
ORD-2003-034 - Proposed Zoning Ordinance & Subdivision Regulations Enforcement Procedures Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-034 - Proposed Zoning Ordinance & Subdivision Regulations Enforcement Procedures Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 12:56:57 PM
Creation date
8/2/2011 11:44:14 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2003
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8m
Document Relationships
Agenda - 06-26-2003-8M
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 06-26-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.30.3b Intermediate Intensity Development Area <br />The Intermediate Intensity Development Area includes land designated as <br />intermediate intensity area in the Stoney Creek Basin Small Area Plan. <br />The Intermediate Intensity area is intended to provide a transition between <br />higher and lower intensity areas. It is envisioned as being predominantly <br />residential with density being determined in large part by the character of <br />existing development. The Intermediate Intensity area contains 1205 <br />acres, and includes the existing residential developments of Strayhorn <br />Hills and Wyngate, areas bordering University Station Road along the <br />eastern side of the Plan area, and area west of NC 86 adjacent to the 1- <br />40 /01d NC 86 Economic Development District. <br />6.30.3c Higher Intensity Development Area <br />The Higher Intensity Development Area includes land designated as <br />higher intensity area in the Stoney Creek Basin Small Area Plan and is <br />generally synonymous with areas designated in the Land Use Element of <br />the Comprehensive Plan as Ten- or Twenty -Year Transition Area. In the <br />future, land within the Higher Intensity area will likely be annexed into the <br />municipalities of Hillsborough or Durham. A mix of land uses is possible. <br />The Higher Intensity area contains 699 acres, most of which lies in the <br />western and northwestern parts of the Stoney Creek Basin Plan Area, <br />with one smaller portion situated on the eastern tip of the area adjacent to <br />the I -85 /US 70 Economic Development District. <br />6 -58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.