Browse
Search
ORD-2003-034 - Proposed Zoning Ordinance & Subdivision Regulations Enforcement Procedures Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2003
>
ORD-2003-034 - Proposed Zoning Ordinance & Subdivision Regulations Enforcement Procedures Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 12:56:57 PM
Creation date
8/2/2011 11:44:14 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2003
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8m
Document Relationships
Agenda - 06-26-2003-8M
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 06-26-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.24.2 Minimum Usable Lot Area for Lots that Utilize Ground Absorption <br />Wastewater Systems <br />Amended <br />9/18/01 The usable lot for parcels between 40,000 square feet and 1.99 acres in size <br />shall be a minimum of 30,000 square feet. Zoning lots two acres and greater <br />shall have a minimum usable lot area of at least 40,000 square feet. <br />6.24.3 <br />Amended <br />9/18/01 Applicability and administrative provisions of Section 6.23 shall apply to this <br />section. <br />6.25 RESERVED <br />*6.26 Extra Requirements for the Major Transportation Corridor (MTC) <br />District. <br />*Amended <br />4 -2 -90 <br />*6.26.1 Permitted Uses <br />*Amended <br />4 -2 -90 Within the Major Transportation Corridor (MTC) District, uses of land and <br />structures are those permitted in the underlying zoning district or districts. All <br />other requirements for the use of land and structures contained in this <br />Ordinance shall be met unless otherwise provided. <br />*6.26.3 _Approval Requirements <br />*Amended <br />4 -2 -90 Within the Major Transportation Corridor District, no construction activity shall <br />begin nor shall any excavation, soil removal, filling, grading or disturbance of <br />vegetation, including trees, be commenced, nor any sign erected until such <br />time as a s ite p Ian h as b een a pproved a nd a p ermit i ssued b y t he Z oning <br />Officer in accordance with Section 21.4 of this Ordinance. <br />*6.26.4 Site Plan Requirements <br />*Amended <br />4 -2 -90 Each application for a permit shall be accompanied by a site plan or plans <br />showing the following: <br />(a) a vicinity map clearly establishing the location of the project. <br />(b) a development summary including total acres, proposed use(s), total <br />building square footage, required and proposed parking spaces. <br />(c) the dimensions and acreage of each lot or portion thereof to be built <br />upon or otherwise used. . - <br />(d) the layout of the entire project including the proposed uses of all <br />building and their relation to surrounding properties. <br />(e) the location and dimensions of present and proposed streets and <br />highways. <br />6 -47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.