Orange County NC Website
5. Minor Amendments to Plans and Specifications <br />Amendments to the plans and specifications of the stormwater <br />control structure and /or the operation and maintenance plan or <br />manual may be approved by the County Engineer, provided that <br />the changes do not involve a change in the size or location of the <br />structure. Proposed changes shall be prepared by a North <br />Carolina registered professional engineer or landscape architect <br />(to the extent that the General Statutes, Chapter 89A, allow) and <br />submitted to and reviewed by the Erosion Control Supervisor <br />prior to consideration by the County Engineer. <br />a. If the County Engineer approves the proposed changes, <br />the owning entity of the stormwater control structure shall <br />file sealed copies of the revisions with the Erosion Control <br />Supervisor. <br />b. If the County Engineer disapproves the changes, the <br />proposal may be revised and resubmitted to the Erosion <br />Control Officer as a new proposal. If the proposal has not <br />been revised and is essentially the same as that already <br />reviewed, it shall be returned to the applicant. <br />C. The County Engineer shall report a ny s uch r evisions t o <br />the Board of County Commissioners at the next available <br />regular meeting. <br />6. Maior Amendments to Plans and Specifications <br />Amendments to the plans and specifications of the stormwater <br />control structure and /or the operation and maintenance plan or <br />manual which involve a change in the size or location may be <br />approved by the Board of Commissioners after receiving a <br />recommendation from the County Engineer. Proposed changes <br />shall be prepared by a North Carolina registered professional <br />engineer or landscape architect (to the extent that the General <br />Statutes, Chapter 89A, allow) and submitted to and reviewed by <br />the Erosion Control Supervisor prior to review by the County <br />Engineer. <br />7. Revision of Plan Required if Found to be Inadequate <br />If the County finds that the operations and maintenance plan or <br />manual is inadequate for any reason, the owning entity shall be <br />notified of any required changes and shall prepare and file copies <br />of the revised agreement with the Orange County Register of <br />Deeds, the Erosion Control Supervisor, and the owning entity. <br />c) Inspection and Release of the Performance Bond <br />1. Inspection by Erosion Control Supervisor <br />The stormwater control structure shall be inspected by the <br />Erosion Control Supervisor, after the owning entity notifies the <br />6 -37 <br />