Orange County NC Website
7.15.10 <br />Site Planning <br />7-20 <br />7.16 <br />PD -01: Planned Development -Office and Institutional Districts <br />7 -22 <br />7.16.1 <br />PD -01 Districts: Defined, Intent, Where Permitted <br />7 -22 <br />7.16.2 <br />Permitted Principal Uses and Structures <br />7 -23 <br />7.16.3 <br />Height Limitations <br />7 -23 <br />7.16.4 <br />Permitted Intensity of Development <br />7 -23 <br />7.16.5 <br />Setbacks Required Adjacent to Residential Districts <br />7 -24 <br />7.16.6 <br />Site Planning <br />7 -24 <br />7.16.7 <br />Sign Limitations <br />7 -25 <br />7.17 <br />Planned Development - Industrial Districts <br />7 -26 <br />7.17.1 <br />PD -1 Districts: Defined, Intent, Where Permitted <br />7 -26 <br />7.18 <br />PD -MU: Planned Development - Mixed Use Districts <br />7 -28 <br />7.18.1 <br />PD -MU Districts: Defined, Intent, Where Permitted <br />7 -28 <br />7.19 <br />PD -PWI: Planned Development - Protected Watershed <br />Industrial Districts <br />7 -34 <br />7.19.1 <br />PD -PWI District: Defined, Intent, Where Permitted <br />7 -34 <br />7.20 <br />PD -MHP Planned Development - Mobile Home Park District <br />7 -38 <br />7.20.1 <br />PD -MHP District: Defined, Intent, Where Permitted <br />7 -38 <br />7.20.2 <br />Minimum and Maximum Area Required for <br />Establishment of District <br />7 -38 <br />7.20.3 <br />Permitted Principal Uses and Structures <br />7 -39 <br />7.20.4 <br />Development Requirements for Mobile Home Parks <br />7 -39 <br />7.20.4x) <br />Mobile Home Space Requirements <br />7-39 <br />7.20.4b) <br />Mobile Horne Stand Requirements <br />7 -40 <br />7.20.4c) <br />Separation Requirements <br />7 -40 <br />7.20.4d) <br />Installation of Individual Mobile Homes <br />7 -41 <br />7.20.4e) <br />Vehicular Access <br />7-41 <br />7.20.4f) <br />Identification Signs /Street Numbering <br />7 -43 <br />7.20.4g) <br />Grounds and Buildings <br />7 -44 <br />7.20.4h) <br />Erosion and Stormwater Control Requirements <br />7 -45 <br />7.20.4i) <br />Recreation Areas and Facilities <br />7 -45 <br />7.20.4j) <br />Landscaping and Screening <br />7 -45 <br />7.20.4k) <br />Utilities <br />7 -46 <br />7.21 <br />PD -ED Planned Development- Economic Development District <br />7-48 <br />7.21.1 <br />PD -ED District: Definition and Intent <br />7 -48 <br />VIII <br />SPECIAL USES <br />8-1 <br />8.1 <br />Intent <br />8-1 <br />8.3 <br />Establishment of Classes of Special Uses; Authority to <br />Approve or Disapprove <br />8-3 <br />8.4 <br />Procedure for Submission and Consideration of <br />Applications for Approval of Special Uses <br />8 -3 <br />8.4.1 <br />Pre- Application Conference <br />8 -3 <br />8.4.2 <br />Application Submitted to Zoning Officer <br />8-4 <br />8.4.3 <br />Zoning Officer Prepares Analysis and Recommendations <br />8 -4 <br />8.4.4 <br />Recommendation Submitted to Planning Board or <br />Board of Adjustment <br />8-5 <br />8.4.5 <br />Public Hearing Required, Notice Specified <br />8 -5 <br />8.4.6 <br />Planning Board Action on Class A Special Use <br />8 -5 <br />8.4.7 <br />Action on the Application <br />8 -6 <br />8.4.8 <br />Imposed Conditions <br />8-6 <br />8.4.9 <br />Withdrawal of Application <br />8 -6 <br />8.4.10 <br />Effect of Denial on Subsequent Petitions <br />8 -6 <br />8.4.11 <br />Time Limits on Special Uses <br />8 -7 <br />8.5 <br />Action Subsequent to the Board Action <br />8 -7 <br />