Browse
Search
2011-234 AMS - H. M. Kern Corp for Change Order #4 for Health Department Renovations at Whitted Building
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-234 AMS - H. M. Kern Corp for Change Order #4 for Health Department Renovations at Whitted Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2011 10:28:24 AM
Creation date
7/26/2011 10:28:20 AM
Metadata
Fields
Template:
BOCC
Date
7/26/2011
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager Signed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALITY ELECTRIC 00., INC <br />OONIIYiERC7AL~INDCI~TRIAL~ItESiDENT1AL V7IRING <br />9'ELEPHONEs 919-S9rr8113 FAX 919.59b8114 <br />3033 V~Ai~ FOREST HWY <br />DLAtHAM, NORTH CAROLINA 2T/03 <br />1VIay i2~, 2011 <br />Orange County I-iealth I}cpartmcnt <br />SUBJECT: FIRE ALARM Q-fANGE ORDER <br />500' 3/4" EMT conduit w/coup. and corn. 5455.00 <br />20 4" sq. box deep wlblank planes 58Q,00 <br />100' 1/2" flexible conduit w/connector 5140.00 <br />3 20 Amp 5q. D breakers 560.00 <br />1000' N 12 Thhn CJu wire 5205.91 <br />1000' 16/2 Fine Alarm cable 3231.00 <br />8 single gang bell boxes wlcovers 57'2.00 <br />40' light tight flex 540.00 <br />l0 light tight corn. $40 d0 <br />80 PVC3/4" conduitw/fitting $98,00 <br />lot strapping and mounting misc. <br /> 31,721.00 <br /> taxes 313,~•3g <br /> 51,854.38 <br /> 1596 markup 527'8.16 <br /> 32,132.54 <br />200 labor hours 39•~.~ <br /> 511,132.54 <br />1 addressable fire alarm panel w/buih in DACT <br />2 batteries <br />2 smoke detectors w/base <br />2 heat detectors <br />7 zone modules <br />11 monitor modules <br />2 relaymodules <br /> surge suppressor <br /> electrical materials for newpanel install <br /> on-site Iabor <br /> Total including tax 55,860.00 <br /> 7.5°r6 sub-contractor mark up 39.50 <br /> 56,299.50 <br /> <br />Total w/electrical and fire alarm 511.132.54 <br />317,432.04 <br />Sincerer <br />Douglas V. Painter <br />
The URL can be used to link to this page
Your browser does not support the video tag.