area loop walking trail is expected to be paid for from a $50,000 grant from the state <br />Recreational Trails Program. <br />Funding for the park has been previously identified from the aforementioned LWCF grant <br />($262,000) planned as the primary funding source for the park construction. A total of <br />$221,472 from LWCF grant remains (subtracting cost of site design, archaeological survey <br />and topo survey), and the Board has previously authorized $45,000 toward a caretaker <br />residence to be moved to the park from Heritage Hills. Durham County has also budgeted <br />$100,000 to be matched by Orange County toward additional construction costs. <br />Table 1 - Previously ADDroved Revenues <br />Source <br />LWCF grant — remainder <br />Amount <br />$221,472 <br />Trails grant <br />$50,000 <br />Caretaker House relocation — Orange County portion <br />$45,000 <br />SUBTOTAL <br />$316,472 <br />Other Possible Revenue Sources <br />Durham County already allocated — requires Orange County match <br />$100,000 <br />Orange County Payment -in -Lieu funds (not yet authorized, <br />remainder of match is $45,000 in house relocation funds above)? <br />$55,000 <br />TOTAL - ALL SOURCES <br />$471,472 <br />If Orange County were to match Durham County's $100,000 (recommended to be <br />accomplished by allocating $55,000 in additional funds from the Northern District Park <br />Payment -in -Lieu fund), the differential between the staff - revised cost estimate and the <br />available funds is $152,667 (or $76,334 for each jurisdiction). <br />There are two options the Board may wish to consider to address the funding shortfall: <br />Option 1 — Additional Revenue: To address the remaining County portion of the <br />estimated construction cost (assuming Durham County does likewise), the Board could <br />opt to "borrow" $76,334 from one of the County park facility projects funded through the <br />2001 bond — borrowing from a project that is designated for construction beyond 2004 and <br />replenishing those funds in a future CIP prior to construction of the park. A budget <br />amendment would be prepared identifying the temporary funding source if this option is <br />chosen. <br />Option 2 — Deferral of Facilities: The Board could opt to defer some of the facilities not <br />originally part of the LWCF project. Some options might include: <br />Table 2 — Possible Facilitv Deferrals <br />Even with the deferral of the above facilities (which would lower the project construction <br />cost to $535,139), and the use of the remaining payment -in -lieu funds ($55,000 as shown <br />in the first chart above), an additional $31,834 of County funds would be needed to <br />build the remaining facilities. As detailed in option 1 above, staff recommends that the <br />Park office $35,000 <br />Gravel instead of paved entrance road <br />$30,000 <br />Picnic Shelter <br />$24,000 <br />TOTAL Deferred <br />$89,000 <br />Even with the deferral of the above facilities (which would lower the project construction <br />cost to $535,139), and the use of the remaining payment -in -lieu funds ($55,000 as shown <br />in the first chart above), an additional $31,834 of County funds would be needed to <br />build the remaining facilities. As detailed in option 1 above, staff recommends that the <br />