Orange County NC Website
<br />I am not certain if this is the scope of services that you were anticipating but, from a goad <br />quality analysis standpoint, this is what it will take. We could, of course, reduce the <br />scope but the reliability of the cost estimates and projected savings would then be less. <br />If we are off base, just let me know and we will adjust if we can. I will be in the office <br />Tuesday from 8:30 until noon. Then I will be out until late Friday night. However, if <br />you do want to gn after the grant I will need to work on it that weekend (May 3~d and <br />4`~. The main time that I can work on the grant will be May 3'~ though May 8~°. I will <br />try to call you on Tuesday. <br />Thanks again for the chance to work with you. <br />Sincerely, <br />~~ <br />e Nicklas, AIA <br />President, Innovative Design <br />