Orange County NC Website
[/T[/i <br />The following outlines the base audit and analysis costs that will occur, regardless of the <br />specific measures selected. This scope assumes that there are "As-Built" plans for the <br />facility and that additional, detailed field work is not required to determine the existing <br />conditions. <br />Base Tasks <br />Task Base 1: Complete audit of the facility <br />ID 8 hours at $125/hour $ 1,000 <br />12 hours at $90/hour $ 1,080 <br />Padia 6 hours at $125/hour $ 720 <br />8 hours at $90/hour $ 720 <br />Task Base 2: Input of base building into the DOE II <br />energy simulation <br />Padia 40 hours at $90/hour $ 3,600 <br />Task Base 3: Coordination with Orange County <br />staff, interim review, information <br />gathering, and final presentation to Orange <br />ID 20 hours at $125/hour $ 2,500 <br />30 hours at $90/hour $ 2,700 <br />20 hours at $50/hour $ 1,000 <br />Padia 8 hours at $125/hour $ 1,000 <br />4 hours at $90/hour $ 360 <br />Total Base Costs $14,680 <br />The proposed analysis of sustainable options are broken down into the categories of <br />energy, water, and green products and systems. <br />Energy <br />Task E1: Daylighting/window strategies <br />ID 5 strategies x 10 hours x $90/hour $ 4,500 <br />2 hours x $125/hour $ 250 <br />Padia 2 strategies x 4 hours x $90/hour $ 720 <br />1 hour x $125/hour $ 125 <br />