Browse
Search
Agenda - 05-06-2003 - 8e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 05-06-2003
>
Agenda - 05-06-2003 - 8e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2011 2:47:42 PM
Creation date
7/12/2011 2:47:39 PM
Metadata
Fields
Template:
BOCC
Date
5/6/2003
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8e
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />C. Site Conditions: What are the open-space requirements and the t+t~'~ <br />tono~raphic, geologic, soil, wetlands, andlor other special features or conditions that <br />~f€eet circumscribe the development of this parcel? What is the likely effect of such <br />features and conditions on the ability to develop the site? Based on these conditions or <br />constraints, is this an appropriate site for development? "-'° +''°r° ~~~~ +^~^^~°P i~ <br />^'' ° ~a~*~^~~? (20-1-8 points total) <br />B. Project Feasibility (30 points total) <br />A. The applicant must submit a general land use concept plan. (10 points total) <br />B. Anon-binding, but professionally competent project feasibility budget must be submitted <br />using the following worksheet. (Use current dollars, not inflation-adjusted dollars). (~10 <br />points total) <br />Total Acreage <br />Projected # of units <br />Projected type and tenure of units <br />Projected income targeting distribution <br /> <br />COST ESTIMATES Total Per Unit <br />Re uested land banking award <br />Total land cost <br />of total land cost from bond funds* <br />Soft Costs <br />Infrastructure Costs <br />SubtotaUDeveloped Lot Costs <br />of total develo ed lot costs from bond funds <br />Unit(s) Construction Costs <br />Other Costs leases eci ) <br />Total Costs <br />* Leveraging is required. This percentage must be less than 100% for the project to be eligible <br />for a Land Banking award. <br />
The URL can be used to link to this page
Your browser does not support the video tag.