Browse
Search
2003 NS Housing - Mary Obie Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2003
>
2003 NS Housing - Mary Obie Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:46:31 AM
Creation date
7/7/2011 10:57:17 AM
Metadata
Fields
Template:
BOCC
Date
3/24/2003
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8j
Document Relationships
Agenda - 03-24-2003 - 8j
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 03-24-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />Mary Obie <br />405 W. Corbin St. <br />Hillsborough <br />732-8415 <br />12/23/02 <br />Bath: <br />1. Remove the bath interior framing, wall covering and bedroom, hall and <br />exterior door units. <br />2. Frame in the bedroom and exterior door opening. <br />3. Reframe the door opening fora 36-inch door (see attached drawing). <br />4. Install R-13 in the exterior wall. <br />5. Install'/2" inch sheetrock on the ceiling and MR sheetrock on the inside <br />walls. Install '/z inch sheetrock on the hall framing. Tape and finish the <br />sheetrock smooth. <br />6. Install a 36-inch, lauan, prehung door unit and privacy lockset. <br />7. Install matching baseboard. <br />x <br />8. Install 2x8 blocking for the grab bars. Install a 36-inch grab bar at the left <br />hand head of the tub. Install 48" grab baron an angle on the long wall of <br />the tub. <br />9. Install a five piece accessory kit to include two 24-inch towel bars, a <br />tumbler holder, a soap dish and a paper holder. <br />10. Install a transfer seat. <br />11. Install '/< inch lauan plywood on the floor. Prepare the floor for vinyl. <br />12. Install vinyl floor covering, shoemold and metal trim. Vinyl to cost not less <br />than $14/yd. <br />13. Prepare all surfaces for paint. Paint the ceiling with ceiling white latex <br />paint. Paint the walls antl tnm with semigloss latex paint: Paint to cover <br />completely. Install two coats of polyurethane on the entrance door. <br />
The URL can be used to link to this page
Your browser does not support the video tag.