Browse
Search
2003 NS Housing - Mary Obie Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2003
>
2003 NS Housing - Mary Obie Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:46:31 AM
Creation date
7/7/2011 10:57:17 AM
Metadata
Fields
Template:
BOCC
Date
3/24/2003
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8j
Document Relationships
Agenda - 03-24-2003 - 8j
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 03-24-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />--- Mary Obie <br />405 W. Corbin St. <br />Hillsborough <br />732-8415 <br />12/23/02 <br />5. Install aluminum fascia and vinyl soffitt. <br />Crawlspace: , <br />1. Install two pole jacks on 16"x16" concrete footers. <br />2. Install two pole jacks on 16"x16" concrete footers with a 4x4 support beam <br />under the rear porch. <br />3. Install two pole jacks on 16"x16" concrete footers with a 4x4 support beam, <br />in the main crawl space side of the block wall to the rear porch. <br />Interior: <br />Front Hall: <br />1. Remove the front storm door and door unit. Install asix-panel wood door <br />unit cut to fit the opening. Door unit wilt have an aluminum threshold and <br />weather-stripping.~lnstall lockset and deadbolt to be keyed the same and a <br />wide view peephole. <br />2. Reinstall the existing storm door. <br />3. Remove the existing ceiling,. crown mold and comer trim. Install 'h inch <br />sheetrock on the ceiling. Tape and finish the sheetrock smooth. <br />4. Tape and finish the sheetrock walls properly. <br />5. Install an attic access with aluminum stairs. <br />6. Prepare all surfaces for. paint. Paint the ceiling with ceiling white latex <br />paint. Paint the walls with flat latex paint, the crown mold and attic access <br />with semigloss- latex paint. Paint to cover completely. Install one coat of <br />polyurethane on the trim; baseboard and doors. _._ _ __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.