Browse
Search
2003 NS Housing - Mary Obie Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2003
>
2003 NS Housing - Mary Obie Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:46:31 AM
Creation date
7/7/2011 10:57:17 AM
Metadata
Fields
Template:
BOCC
Date
3/24/2003
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8j
Document Relationships
Agenda - 03-24-2003 - 8j
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2003\Agenda - 03-24-2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ,. • Mary..Obie <br />405 W. Corbin St. 4 <br />Hillsborough <br />732-8415 <br />12/23/02 <br />Exterior: <br />1. Repair the right and left fascia and the left soffltt. <br />2. Remove the shingles on the bay window. Install 151b. felt and matching <br />shingles. Flash the window properly. <br />3. Paint the foundation, chimney, the rear siding and all exposed previously <br />painted wood. Paint the exterior trim and front and rear doors with at least <br />two coats of semigloss exterior latex paint. Paint the wood siding and <br />foundation with at least two coats of flat latex, exterior latex paint. Paint <br />the rear porch decking with at least two coats of latex porch and deck <br />enamel. Paint the front posts with at least two coats of semigloss latex <br />paint paint. Paint to cover completely. <br />4. Install plastic splash blocks for each downspout. <br />5. Caulk ail open aluminum seams on the window trim. <br />6. Install four vinyl replacement windows with double insulated glass, one <br />openable sash, locks and screens in the attic. <br />.i <br />7. Remove the band on the rear deck. Install a 2x8 PT band correctly using <br />5/8 inch, galvanized carriage bolts. <br />8. Repair the left crawl space access door to close properly. <br />Roof: <br />1. Install a shingle type ridge vent ventilation system. <br />2. Remove the shingles on the short section of the roof over the rear <br />entrance door to the dining room. Install 151b. felt, aluminum drip edge and <br />matching three tab fiberglass shingles. <br />3. Install approx. 32 sq. ft. of sheathing on the dining room rear entrance <br />roof:..... <br />4. Install a 2x4 barge rafter and 1x6 fascia. <br />
The URL can be used to link to this page
Your browser does not support the video tag.