Orange County NC Website
Page 2 of 3 <br />OBrienAtkins <br />Step II -Production of illustrations and planning exhibits; <br />1. We will finalize and render the analysis exhibits. <br />2. We will prepare 3 concept plans of the selected EDD sites chosen to represent the development <br />types desired. <br />3. We will compile representative photographs both air photo and plan elevation view of the mixed <br />use developments being proposed with approximate background site development statistics. <br />Some photographs would be from local developed sites and a few representative examples <br />without statistics. <br />4. We will prepare supportive text for the planning concepts and illustrations. Text to include <br />general aspects of a site development plan such as Floor Area Ratio (FAR), impervious area <br />requirements, parking, landscaping, setbacks, stormwater controls, etc. <br />5. We will mount the planning concepts, analysis and photographs on foam core boards for the <br />County's continued use. <br />6. We will transmit to the County all exhibits and illustrations in electronic format for their <br />continued use. <br />Deliverables: <br />1. Site analysis plans of natural features <br />2. Buildable area study and regulatory plans of the 3 selected sites <br />3. Summary program report (8 '/z" x 11" with 11" x 17" foldout plans) <br />4. Conceptual plans of 3 selected sites <br />5. Story boards (6) with plans and photos (foam core `gator' boards 30" x 42") <br />6. Electronic delivery of all components of the photographs, illustrations and planning concepts for <br />website use. <br />Comuensation and Schedule: <br />O'Brien/Atkins will prepare the above scope of services for the following lump sum fee: <br />X30,650.00 (Thirty Thousand Six Hundred Fifty Dollars) <br />Reimbursable expenses will be billed beyond the lump sum fee named above and will include <br />printing, mileage/travel and any postage. Invoices are due within 30 days of receipt. <br />We anticipate approximately 10 - 12 weeks for the project's completion. We understand that the <br />products need to be ready on or about August 15, 2011. <br />Thank you for this opportunity to work with you on this exciting project. If the contents and terms of <br />this proposal are acceptable, please indicate by signing below and returning a copy to my attention this <br />