Orange County NC Website
~~a~ AIA <br />Change Order <br />Document G701 rM - 2001 <br />PROJECT: (Name and address) CHANGE ORDER NUMBER: 003 OWNER ^ <br />Qrange Co. Health Dept. Renov~Ans, Janie 7 2c}ll <br />Richard L. Whined Bldg. ~ ARCHITECT ^ <br />Hillsborough, NC ARCHITECT'S PROJECT NUMBER: 1001 <br />CONTRACTOR ^ <br />TO CONTRACTOR: (Nmne and address) FIELD ^ <br />H. M. Kern Corp. CONTRACT DATE: February 16, 2011 <br />160 'i7natchc_r Road OTHER ^ <br />Greensboro, NC 2740`3. CONTRACT FOR: G. nerd Constrtu tic~n <br />The Contract is changed as follows: <br />(hulccde, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br />'[he following FC!J's are the results o.f concealed cond:iticros: <br />PCO--03 Rev. 2: Additional wall ~ floor demolition ADD: $10,391.00 <br />PCO•-04 Rev. 2: 1st and 2nd floor beam repairs ADD: 2,003.00 <br />P00•-05: Modify sa~.urity screens ADD: 3,334.00 <br />P00-O6: Add steel lintels to support exist. wall conditions ADD: 4,02.00 <br />PCO•-10: Install isolation valve in water supply to "B" bldg. ADD: 630.00 <br />1'00•-15: Waste line for toilets,#106 ~ 10$ ADD: 908.00 <br />The original (Contract Sum) ( )was $763,800.00 ; .~~~~F~.'~ <br />The net change by previously authorized Change Orders <br />The (Contract Sum) ((q>![~~riee) prior to this Change Order was <br />The (Contract Sum) ( will be (increased) (~~~i>l <br />by this Change Order in the amount of <br />The new (Contract Sum) (~ rice) including this Change Order will be <br />The Contract Time will be (increased) ( d) by ( 37 )days <br />?:x,023-.~10 <br />996,823.00 <br />21.3+1.00 <br />1,01$,164.00 <br />The date of Substantial Completion as of the date of this Change Order therefore is August 17, 2011 <br />(Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price <br />x hick have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Corley Reelfoot 7,ack, Inc. <br />ARCHITECT (Firm name) <br />222 Cloister Court <br />Chanel Hill, NC X7514 <br />ADDR~~ <br />(Sigra •e) <br />Kenneth F R~fm~t*_ ATA <br />(Typed name) <br />.IIvN~ 7. ~t 1 <br />DATE <br />H. M. Kern Corp. <br />CONTRACTOR (Firm name) <br />160 `Il~atcher Road <br />Greensboro}_ NL' 2740'9 <br />ADDRESS <br />BY (Signature) <br />(Typed name) <br />Orange County <br />OWNER (Firm name) <br />PO Box 81$1 <br />H' 1 b ~ o h NC 27278 <br />ADDRESS <br />BY (Signatzrre) <br />(Tipped name) <br />~ - s -- - i <br />DATE <br />CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that <br />changes will not be obscured. <br />l/ <br />AIA Document G7017TA - 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, <br />or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. <br />Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, a-mail <br />The American Institute of Architects' legal counsel, copyright@aia.org. <br />