Browse
Search
Agenda - 03-24-2003 - 8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 03-24-2003
>
Agenda - 03-24-2003 - 8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 3:04:58 PM
Creation date
6/30/2011 3:51:46 PM
Metadata
Fields
Template:
BOCC
Date
3/24/2003
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8j
Document Relationships
2003 NS Housing - Mary Obie Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />Mary Obie <br />405 W. Corbin St. <br />Hillsborough <br />732 -8415 <br />12/23/02 <br />Bath: <br />1. Remove the bath interior framing, -wall covering and bedroom, hall and <br />exterior door units. <br />2. Frame in the bedroom and exterior door opening. <br />3. Reframe the door opening for a 36 -inch door (see attached drawing). <br />4. Install R -13 in the exterior wall. <br />5. Install %2" inch sheetrock on the ceiling and MR sheetrock on the inside <br />walls. Install Y2 inch sheetrock on the hall framing. Tape and finish the <br />sheetrock smooth. <br />6. Install a 36 -inch, lauan, prehung door unit and privacy lockset. <br />7. Install matching baseboard. <br />i <br />8. Install 2x8 blockinb for the grab bars. Install a 36 -inch grab bar at the left <br />hand head of the tub. Install 48" grab bar on an angle on the long wall of <br />the tub. <br />9. Install a five piece accessory kit to include two 24 -inch towel bars, a <br />tumbler holder, a soap dish and a paper holder. <br />10. Install a transfer seat. <br />11. Install '/< inch lauan plywood on the floor. Prepare the floor for vinyl. <br />12. Install vinyl floor covering, shoemold and metal trim. Vinyl to cost not less <br />than $14 /yd. <br />13. Prepare all surfaces for paint. Paint the ceiling with ceiling white latex <br />paint. Paint the walls and trim with semigloss latex paint. Paint to cover- <br />completely. Install two coats of polyurethane on the entrance door. <br />
The URL can be used to link to this page
Your browser does not support the video tag.