Browse
Search
2011-219 Solid Waste - Judy D. Brooks for Approval of Food and Organic Waste Collection and Composting Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-219 Solid Waste - Judy D. Brooks for Approval of Food and Organic Waste Collection and Composting Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 4:23:38 PM
Creation date
6/22/2011 3:28:31 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
5j
Document Relationships
Agenda - 06-21-2011 - 5j
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 06-21-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
43 <br />Facility: Brooks Compost Facility ~ Page 2 of 3 <br />SWC Permit #: 14-05 <br />County: Chatham <br />Permit Conditions: <br />1. Operation and maintenance of this facility shall be in accordance with the Solid Waste <br />Compost Rules (1 SA NCAC 13B, Section .1400), the Permit Application and the <br />Operation and Maintenance Manual submitted with the permit application, and these <br />permit conditions. Failure to comply may result in compliance actions or permit <br />revocation by the Division of Waste Management. <br />2. This facility shall be operated in such a manger that erasion and runoff from the site <br />shall be controIled: Any leachate generated at the facility and any runofffrom the <br />facility shall be managed in such a manner that ground or surface water quality will <br />not be a~verseIy affected. The facility shall be maintained to prevent the. <br />accumulation of stormwa#er er leachate or_-travel areas or active composting sites. <br />3. An appropriate Division of Water Quality permit for managing any stormwater or <br />wastewater an the facility shall be maintained. <br />4. Only materials-spec~£ically listed in the permit application may be managed at this <br />facility. ~ Before additional materials may be added,-there must be adequate testing and <br />prior approval by the-Division of Waste Management in writing. <br />5. Ail compact produced at the facility shall meet the requirements of Rule .1407 of the <br />-Solid Waste Compost Rules and the permit application. <br />6. Testing_and reporCing shall be conducted in accordance with the requirements of Rule <br />.1408 and the permit application. An annual report of facility activities-for the fiscal <br />year July I to June 30 shall be-sabrnitted to the Division by August 1 of each year on <br />forms provided by the Division. This report shall include the amount of materials <br />composted in tons <br />7. The compost operation and the -compost pad shall=be operated and maintained with <br />sufficient dust control measures. to minimize airborne emissions and to prevent dust <br />from becoming a nuisance or safety hazard. <br />8. Windrow data shall be maintained in writing as required to document temperatures, <br />moisture levels and turning intervals. Bulk density and C:N calculations shall be <br />reviewed nv less than every 14 days. - <br />9. Brooks Compost Facility shall ensure that windrow moisture levels in the compost <br />windrows are maintained in the 40-b0% range for newly created windrows and <br />compost windrows within PFRP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.