Browse
Search
Agenda - 06-21-2011 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 06-21-2011
>
Agenda - 06-21-2011 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2011 2:34:01 PM
Creation date
6/20/2011 2:33:57 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
Minutes 06-21-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
ORD-2011-024 Ordinance Amending Zoning Atlas – Efland Area
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Parcel Identification Number <br />PIN) Acres Owner <br />9854-07-4304 6.1 John Lindsa Efland III <br />9854-16-1576 90.73 Efland Sim son Heirs <br />9854-36-1253 2.02 Andrew B. Llo d, Jr. <br />9854-05-1970 4.58 De artment of Trans ortation <br />9854-46-6706 (partial) 8.92 of 206.38 acre <br />arcel Andrew B. Lloyd, Jr. <br />This proposed rezoning is related to aCounty-initiated Comprehensive Plan Land Use Element Map <br />amendment to change the land use category in a portion of this area from Agricultural Residential to <br />Commercial-Industrial Transition Activity Node (also heard at the May 23, 2011 Quarterly Public <br />Hearing). The area subject to the Land Use Element Map amendment was formerly part of the <br />Upper Eno Watershed Critical Area but was removed from critical area designation in 2010. <br />The surrounding area is zoned as shown on the map in Attachment 2. There is existing LC-1 <br />(Local Commercial), NC-2 (Neighborhood Commercial), EC-5 (Existing Commercial), and I-2 <br />(Medium Industrial) in the immediate vicinity as well as R-1 (Rural Residential) and AR <br />(Agricultural Residential) zoning. <br />Public Hearing: At the public hearing, two of the affected property owners and a representative <br />for an additional property owner spoke in favor of the rezoning. An adjacent property owner <br />questioned whether his existing mobile home park would "transition" into something else. A <br />Board member questioned whether rezoning the parcel owned by the Department of <br />Transportation (DOT) would enable direct access onto the Interstate access road. The draft <br />minutes for the May 23, 2011 Quarterly Public Hearing are included in Attachment 4. <br />Staff response: Existing adjacent and nearby uses will not be changed by this rezoning. The <br />existing mobile home park can continue as a mobile home park under the terms contained in the <br />Unified Development Ordinance and the current zoning of the mobile home park is not affected <br />by this proposed rezoning. Because the mobile home park in question pre-dates the adoption of <br />zoning regulations, it cannot be expanded without obtaining the approvals required for mobile <br />home parks. <br />The DOT parcel is included in the rezoning proposal because it is Orange County zoning <br />practice to extend zoning boundaries to the centerlines of adjacent roadways. Changing the <br />zoning of parcels owned by DOT does not change DOT policies regarding roadway or driveway <br />access to public streets. The narrow parcel does not meet any standards for development. <br />Planning Director's Recommendation: The Planning Director recommends approval of this <br />rezoning based on the following: <br />A. Th a rezoning is consistent, or will be consistent, with the adopted Comprehensive Plan <br />which designates the parcels as Commercial-Industrial Transition Activity Node. If the <br />associated Land Use Element map amendment is not approved by the BOCC, this <br />rezoning will not be acted upon by the BOCC as scheduled because it would not be <br />consistent with the adopted Comprehensive Plan. <br />B. Th a rezoning is consistent with various Principles, Goals, and Objectives, of the adopted <br />Comprehensive Plan (see section B of Attachment 1). <br />
The URL can be used to link to this page
Your browser does not support the video tag.