Browse
Search
Agenda - 06-21-2011 - 5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 06-21-2011
>
Agenda - 06-21-2011 - 5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 4:22:07 PM
Creation date
6/20/2011 12:08:00 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5j
Document Relationships
2011-219 Solid Waste - Judy D. Brooks for Approval of Food and Organic Waste Collection and Composting Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
Minutes 06-21-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />viii. Each service vehicle must not leak collected organic material and/or fluids, and the exterior <br />of vehicles should be reasonably clean and represent the County in a professional. manner; <br />ix. Each service vehicle must meet all Federal, State and local regulations and be equipped <br />with a spill kit to assist in the cleaning of any fluid leaks or spills including diesel fuel, <br />hydraulic fluid, oil, etc. <br />x. .Work with the County and generator to determine the minimum number of service <br />containers needed for collection. ' <br />xi. Guarantee that properly separated. food waste and organic waste material will .not be <br />landfilled. <br />III. GENERAL REQUIREMENTS FOR SELECTED CONTRACTOR . <br />A. Reporting <br />Beyond those requirements listed in Section II, Subsection F, Contractor shall submit monthly and annual <br />reports to the County. The required monthly reports shall be submitted with invoice for services, and shall <br />include: <br />• Itemization of ail charges to County for materials used (if applicable), cost per ton, and total tonnage; <br />• Total weights cdiiected for each collection day for each business; <br />• Total weights collected from each business in the program for that respective month. <br />Required annual reports are to include summaries of the above information, and are to be submitted by <br />August 1 n of each year. <br />B. Insurance Requirements <br />All insurance requirements are included in the County's Service contract which. is included. The <br />successful contractor shall be required to enter intfl the Service Contract <br />Evidencepf insurance must be provided with the proposal. <br />C. Term <br />The term of the Contract shall be for a five (5) year period beginning upon the date of execution of the Contract <br />and terminating #ive (5) years from the effective date provided-that: <br />• funds are authorized annually by the Board of Orange County Commissioners; <br />• neither County nor the Contractor desire to after the-terms of the contract during the five year period, and <br />• the Contract is not otherwise terminated through provisions of another clause of the Contract. <br />At the close of the inftiai five (5) year term the contract may be extended at the option of County and with the <br />agreement of Contractor to include up to two additional two year renewal periods. <br />N. PROPOSAL PROCEDURES <br />A. Proposed Timeline <br />The proposed timeline for the RFP process and program implementation is as follows: <br />April 29, 2011.-RFP 367-5175 is issued <br />May 6, 2011 at 3:00 PM -Mandatory Pre-Proposal Meeting <br />May 10, 2011 at 3:00 PM -Deadline for written questions <br />May 17, 2011 at 5:00 PM -RFP submissions are due <br />
The URL can be used to link to this page
Your browser does not support the video tag.