Browse
Search
Agenda - 06-21-2011 - 5cc
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 06-21-2011
>
Agenda - 06-21-2011 - 5cc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2011 11:35:51 AM
Creation date
6/20/2011 11:35:48 AM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5cc
Document Relationships
2011-423 Solid Waste - Duke Energy Carolinas LLC - Approval of Duke Energy Right of Way Agreement at OC South Landfill
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
Minutes 06-21-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: June 21, 2041 <br />Action Agenda \ <br />Item No. 5-cc (~rop~sa~l ) <br />SUBJECT: Approval of Duke Energy Right of Way at Orange County South Landfill <br />DEPARTMENT: 8!olid Waste Management <br />ATTACHMENTO: <br />Right of Way Agreement <br />PUBLIC HEARING: (Y/N) No <br />INFORMATION CONTACT: <br />Gayle Wilson, Solid Waste, (919) 968- <br />2885 <br />Michael Talbert, Interim-Assistant <br />County Manager, (919) 245-21-53 <br />PURPOSE: To consider approving a right of way agreement as requested by Duke Energy for <br />power lines to be installed at the Orange County South Landfill. <br />BACKGROUND: Duke Energy will be installing certain (underground) power transmission lines <br />at the Orange County South Landfill and has requested that the County grant a 7.5' easement <br />on each side of-the- installed lines. A map showing actual location of lines will be attached to <br />the easement agreement at the completion of the work. The installation- of the power <br />transmission lines in the landfill will-.not damage or require the removal of any trees. <br />The right of way will extend 168 feet from an existing power line along Eubanks Road to the <br />flare- station area. The purpose of the line is to power the flare station and gas transmission <br />equipment components of the landfill gas recov-ery project pursuanf to the agreement_between <br />UNC-Chapel Hill and Orange County. <br />FINANCIAL IMPACT: There is no financial impact associated with granting this request. <br />RECOMMENDATION(S): The Manager recommends that the Board approve the right of way <br />agreement with Duke Energy for the power lines at the Orange County South Landfill and <br />authorize the Chair to sign on behalf of the Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.