Browse
Search
Agenda - 06-07-2011 - 5k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 06-07-2011
>
Agenda - 06-07-2011 - 5k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 3:53:05 PM
Creation date
6/3/2011 3:28:21 PM
Metadata
Fields
Template:
BOCC
Date
6/7/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5k
Document Relationships
Minutes 06-07-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section II <br />Chapel Hill Carrboro School District <br />Elementary <br />The previous year (2009-10) projections for November 2010 at this level were overestimated by <br />85 students. The actual change was an increase of 77 students. Over the previous nine years, <br />this level has shown varying increases in growth. From 2001 unti12003, growth steadily <br />increased; however, in 2004, the increase suddenly fell to an increase of only 3 additional <br />students. In years 2005-06 through 2008-09 student membership increased by over 100 students <br />per year. The projections show the need for Elementary School #11 in 2013-14, versus 2012- <br />13 as projected last year. A site has been acquired for Elementary School #11 with design and <br />permitting largely complete. Efforts are underway to identify construction funding. <br />In 2007, State Statutes were amended so that effective the 2009-2010 school year, children <br />entering kindergarten must be five years old by August 31st of the year starting school, versus <br />the previous statewide policy date of October 16th. This policy change resulted in a 45 week <br />enrollment period as opposed to the typical 52 week enrollment period for the 2009-10 school <br />year. Consequently, there was a substantial drop in kindergarten enrollment. This year there <br />was the typica152 week enrollment period, which resulted in a significant increase in <br />kindergarten enrollment over 2009-10. <br />Middle <br />The previous year (2009-10) projections for November 2010 for this level were overestimated <br />by 20 students. The actual membership increased by 14. Over the previous nine years, growth <br />decreased precipitously from 214 to 68 to 4, to -52 and then has seen modest increases of +12, <br />+20, +30, +75, + 11, and +14 since 2004. The projections show a need for Middle School #5 in <br />2018-19, which is two years later than projected last year. <br />High School <br />The previous year (2009-10) projections for November 2010 for this level were overestimated by <br />22 students. The actual membership increased by 34 students. Over the previous nine years, <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.