Orange County NC Website
55 <br />allowed). <br />7. A twelve (1 2) inch No Concerns <br />water line shall b e <br />extended within the <br />Tinnin load right- <br />of-way from US <br />Highway 70 vest <br />to the northern end <br />of Tinnin Road prior <br />to recordation of <br />the Final Plat. <br />Encroachment <br />agreements shall <br />be obtained from <br />NCDOT for any <br />lines within an <br />existing NCDOT <br />right-of-way. All <br />water line <br />easements within <br />the subdivision <br />shall be shown on <br />the Final Plat. For <br />water line <br />easements located <br />offsite, i.e. outside <br />the boundaries of <br />the subdivision, <br />easement <br />documents with <br />attached survey <br />map shall be <br />recorded <br />concurrently Frith, <br />or prior to, the Final <br />Flat. Any portion of <br />the lines that <br />extend under <br />concrete or paved <br />areas shall be <br />ductile iron pipe. <br />None <br />- - -- - <br />8. Fight -inch The applicant has no None <br />water lines small be issue with an " water <br />installed within the lir -) throughout the <br />