Orange County NC Website
53 <br />engineer and <br />submitted to the <br />Planning and <br />I nspectlons <br />Department. The <br />financial guarantee <br />rust reflect % <br />of that estimate and <br />be issued by an <br />accredited financial <br />institution licensed <br />to do business In <br />North Carolina. <br />4. If the security No concerns None <br />option is chosen, <br />no certificate of <br />occupancy shall be <br />issued until the <br />water lines are <br />certified to the <br />State by the <br />engineer of record <br />that testing and <br />construction is <br />completed. A copy <br />of the certification <br />shall be provided to <br />the Orange county <br />Engineer and the <br />Planning <br />Department. <br />WS shall <br />provide written <br />confirmation of their <br />acceptance of the <br />lines per the State <br />approval letter. <br />The letter shall <br />include that all <br />pressure tests and <br />bacterial testing <br />have been <br />approved by the <br />State. and accepted <br />