Orange County NC Website
the time of review <br />and approval of the <br />building permit. <br />12.A Hillsborough <br />The applicant would <br />Capital Facilities <br />like to continue to <br />Fee, currently <br />review the fees <br />$634.36 per unit, <br />associated with the <br />shall be paid at the <br />project before making <br />time building permit <br />any formal comment. <br />applications lications ere <br />submitted for <br />review and <br />approval. Yids fee <br />is subject to change <br />and will be <br />collected at the <br />applicable rate at <br />the time of review <br />and approval of the <br />building permit. <br />For all locations where <br />service is anticipated a <br />ye connector shall be <br />installed as a service stub <br />out, <br />B. WATER: <br />1. orange Alamance <br />Water System, Inc. <br />(OAWS) and the <br />County Engineer <br />shall approve final <br />water line <br />construction <br />drawings for the <br />entire subdivision, <br />including stubbed <br />out service lines to <br />each lot. No <br />clearing or grading <br />on the site shall <br />occIAr until approval <br />i; obtained. No <br />No Concerns <br />No Concerns <br />None <br />None <br />51 <br />The applicant will have <br />to pay all applicable <br />fees as denoted on the <br />adopted orange <br />County Fee Schedule <br />