Browse
Search
Agenda - 05-23-2011 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 05-23-2011
>
Agenda - 05-23-2011 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2019 11:23:00 AM
Creation date
5/23/2011 3:59:56 PM
Metadata
Fields
Template:
BOCC
Date
5/23/2011
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C1
Document Relationships
Minutes 05-23-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />S <br />L <br />i <br />Traev Parrott <br />Tracy, <br />Per our previous conversation, we have evaluated the preliminary plans, they are acceptable to s and we look forward to <br />review of completed engineering drawings. <br />0 <br />C. N. Edwards Jr,, <br />Disfyiet Engineer <br />Norffi Carol-hia Department or rkansportation <br />R 0. Box <br />115 R. Crescent Square Drive <br />Graham, NC 27253 <br />(336)570 -6833 <br />Email COtMsPondence to and -om this sender is subject to the N. C, Public Records Lair and may be disclosed to third parties <br />From: Tracy Parrott [mallo, r t�errc t� l _ f r# , <br />Sent; Thursday, March 17., 2011 <br />T '.3 Edwards, Charles <br />g Chad. Abbott <br />Subject: Habitat for humanity - Efland <br />Mr. Edwards, <br />I have attached a p df f! 1 of f he Efla nd Ha bitat project we discussed on Monday. We have added the tern- around as <br />req Uested. 1 are still eva I uat in g the adjacent potential use and whether to increase the roadway typ Ica l to a collector. <br />Habitat does grant to use C&G for the b en efit of front lawn /yard areas. We-will continue to develop the desig n and <br />coordinate with your• office ors construction drawing submittals once we complete the p la nn 1 ng phase of the proje ct. Fair <br />the pla r n1ng phase, l reed to assure the county that l have co or 1 nate d with you and that the general p roe ct layout are <br />access co ns1d e rations are acceptable to N C D OT. I would a ppreclate a brief response to that effect if posslble, <br />Th a n ks for your time a nd assistance. TN P <br />Tracy K Parrott, PE <br />Project Manager <br />1000 Corporate Drive, Sprite 101 <br />Hillsborough, NC 27278 <br />Phone: 919.732.3883 <br />Facsimile* 919.732.6676 <br />4 <br />} <br />SUMM <br />� <br />� •� 4# l �7 '45J' <br />Fj{�a� <br />--� <br />V151t 01'r websits: 'click Sum m] kaoo' <br />I <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.