Orange County NC Website
• • j • . • g . • . • g <br /> 2. 530,000 CY Remaining Advantaqes <br /> 82 Months • Extended site life <br /> January 2017 • Additional tipping fees ($50 x 177,930 extra <br /> tons = $8,896,500) compared to existing <br /> permitted capacity <br /> • Revise slopes from 4:1 . Easily constructed and maintained side <br /> to 3:1 slopes to achieve maximum airspace <br /> • Maximum landfill height . Consistent with existing slope construction <br /> • Additional 269,591 CY . No additional cell construction <br /> or 177,930 tons <br /> Disadvantaqes <br /> • Public involvement process <br /> • Construction permit application renewal (5- <br /> yr permit) <br /> • Slightly increases overall landfill height <br /> • Extended site life may have negative <br /> impact on public perception <br /> 3. 617,000 CY Remaining Advantaqes <br /> 96 Months • Extended site life <br /> March 2018 • Additional tipping fees ($50 x 235,350 extra <br /> tons = $11,767,503) compared to existing <br /> permitted capacity <br /> • Revise slopes from 4:1 . Maximum airspace <br /> to 3:1 <br /> • No additional cell construction <br /> • Maximum landfill height <br /> Disadvantaqes <br /> • Includes slope wedge <br /> • Public involvement process <br /> • Additional 356,591 CY <br /> or 235,350 tons • Construction permit application renewal (5- <br /> yr permit) <br /> • Slightly increases overall landfill height <br /> • Considerable difficulty in constructing <br /> wedge airspace recovery over existing <br /> constructed side slopes <br /> • Extended site life may have negative <br /> impact on public perception <br /> Memorandum <br /> To: Frank Clifton, County Manager <br /> From: Gayle Wilson, Solid Waste Director <br />