Browse
Search
Agenda - 05-17-2011- 8c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 05-17-2011
>
Agenda - 05-17-2011- 8c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 3:23:31 PM
Creation date
5/13/2011 3:23:28 PM
Metadata
Fields
Template:
BOCC
Date
5/17/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8c
Document Relationships
Minutes 05-17-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
RES-2011-053 Resolution Endorsing Priority Transportation Projects for Metropolitan Planning Org Regional Priority List 2014-2020 Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
RES-2011-054 Resolution Endorsing Priority Transportation Projects for TARPO Priority List for 2014-2020 Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br />Attachment 5 <br />SCORING FOR HIGHWAY MOBILITY PROJECTS <br /> QUANTITATIVE LOCAL INPUT <br />Tier Data Division Rank MPO/RPO Rank <br /> Congestion = 20% <br />Statewide Benefit/Cost = 20% 20% 10% <br /> Safety = 10% <br /> Pavement Condition = 10% <br /> Economic Competiveness = 10% <br /> Total = 70% <br /> Congestion = 20% <br />Regional Benefit/Cost = 15% 25% 25% <br /> Safety = 5% <br /> Pavement Condition = 5% <br /> Economic Competiveness = 5% <br /> Total = 50% <br /> Congestion = 20% <br />Subregional Safety = 5% 30% 40% <br /> Pavement Condition = 5% <br /> Total = 30% <br />HIGHWAY - Benefit/Cost <br />20% for Statewide Tier Mobility projects <br />15% for Regional Tier Mobility projects <br />Benefits <br />• Based on travel time savings the project is expected to provide <br />• Travel time savings =difference between 2009 v/c and 2009 v/c with project <br />• Travel time savings multiplied by number of daily users (AADT) for 30 years <br />Cost <br />• Based on latest DOT cost estimate if available <br />• Where no DOT cost est. is available, use cost estimate spreadsheet <br />- During QA/QC process (July -August) SPOT will verify with Divisions on reasonableness of estimate <br />HIGHWAY -Economic Competitiveness <br />10% for Statewide Tier Mobility projects <br />5% for Regional Tier Mobility projects <br />Uses TREDIS <br />• Primary input is change in VHT (calculated from travel time savings) <br />• Output is value added based on % change in Division <br />- Includes jobs created, wages increased, increased productivity <br />• Includes forecasted data (from Moody's) <br />- Background baseline growth <br />
The URL can be used to link to this page
Your browser does not support the video tag.