Browse
Search
Agenda - 05-17-2011- 8c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 05-17-2011
>
Agenda - 05-17-2011- 8c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 3:23:31 PM
Creation date
5/13/2011 3:23:28 PM
Metadata
Fields
Template:
BOCC
Date
5/17/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8c
Document Relationships
Minutes 05-17-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
RES-2011-053 Resolution Endorsing Priority Transportation Projects for Metropolitan Planning Org Regional Priority List 2014-2020 Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
RES-2011-054 Resolution Endorsing Priority Transportation Projects for TARPO Priority List for 2014-2020 Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY TRANSPORTATION PRIORITY LIST <br />2011 - 2017 (2012 - 2018) TRANSPORTATION IMPROVEMENT PROGRAM <br />STATUS AND RECOMMENDATIONS <br /> NCDOT DIVISION DCHC MPO <br />ORANGE PRIORITIZATION PRIORITY <br />COUNTY PROJECT DESCRIPTION FOR 2012-2018 FOR 2012- ADDITIONAL INFORMATION/ <br />PRIORITY TIP 2018 TIP STAFF RECOMMENDATION <br />2011-17 <br />11 NC 86 (North of Hillsborouahl Imarovements <br /> SUBMIT AS PRIORITY # 11 A NEW HIGHWAY <br /> PROPOSED NEW DESCRIPTION MOBILITY PROJECT WfTH CHANGED <br /> WIDEN NC 86 FROM US 70 BYPASS TO NORTH OF NC 57 TO FOUR LANES WITH INTERSECTION IMPROVEMENTS AT US 70 BYPASS AND NC57. DESCRIPTION AND LIMIT. <br /> IMPROVEMENTS AT THE NC 86/US 70 BYPASS INTERSECTION t0 InCIUde extending the gUBUing lane for traffic tUrning east Onto US 70 <br /> BypaSS ffom northbOUnd ChUrtOn Street/NC 86. IMPROVEMENTS AT THE NC 86/NC 57 INTERSECTION TO INCLUDE SAFE CROSSING FOR <br /> PEDESTRIANS AND SIDEWALK CONNECTING THE INTERSECTION OF NC 86 AND NC 57 TO AREA OF RENCHER ST. NC 86 IS the major north- <br /> south route through Orange County and is designated in North Carolina's Long-Range Statewide Multimodal Transportation <br /> Plan as a Strategic Highway Corridor. NC 57 converges into US 86 just north of US 70 Bypass. The segment of NC 86 <br /> between NC 57 and US 70 is congested, rendering a high accident location at the intersection of US 70 Bypass at NC 86. <br /> DCHC MPO HAS ASKED THAT LOCAL JURISDICTIONS SUBMIT ONLY 3 NEW HIGHWAY PROJECTS. ORANGE COUNTY <br /> HAS 6 PROJECTS CONSIDERED NEW HIGHWAY PROJECTS. <br />12 NC 86. Bicycle Facilities: Construct bicycle facilities (4-foot paved shoulders) from Chapel Hill (Whitfield Road, SR 1730, SR Bicycle Project BIKE/PED This project did not rank as one of the top <br /> 1731) to Hillsborough (US 70 Business). This project will extend bicycle facilities on Martin Luther King, Jr. Boulevard (NC86) in NCDOT SPOT #20 5 bicycle projects submitted by the DCHC <br /> Chapel Hill to US 70 Business in Hillsborough. NC 86 from Chapel Hill to Hillsborough is experiencing increasing numbers of Unranked MPO and was not ranked in the SPOT <br /> bicyclists using this route and there are also two schools along this route, A.L. Stanback Middle School and New Hope database. The estimated cost is greater <br /> Elementary School (just off NC 86 on New Hope Church Road, SR 1723). This route is listed as priority I of the primary bicycle Division 7 than $1,000,000 so this project would be <br /> routes proposed in the Orange County Bicycle Transportation Plan. This project is included in the Bicycle Program as an Unranked prioritized as a Highway Modernization <br /> incidental need. Orange County requests that bicycle lanes be constructed as an independent project, and, if necessary, project. <br /> programmed in phases. <br /> REMOVE FROM PRIORITY LIST. <br /> DCHC MPO HAS ASKED THAT LOCAL JURISDICTIONS SUBMIT ONLY 3 NEW HIGHWAY PROJECTS. ORANGE COUNTY <br /> HAS 6 PROJECTS CONSIDERED NEW HIGHWAY PROJECTS. <br />CTI <br />
The URL can be used to link to this page
Your browser does not support the video tag.