Orange County NC Website
Description <br />Units <br />Qty <br />Unit Price <br />Total <br />BORING AND J CKING <br />6 inch seweriine w/ 16 inch casing <br />LF <br />$325.00- <br />$0.00 <br />8 Inch sewerline w/ 16 Inch casing <br />LF <br />$400.00 <br />$0.00 <br />12 inch sewedine w/ 24 inch casing <br />LF <br />100 <br />$600.00 <br />$60,000.00 <br />SITE RESTORATION <br />Replacement of Pavement <br />LF <br />3361 <br />$120.D0 <br />$403,320.00 <br />Removal & Replacement of Unusable <br />Material <br />EA <br />300 <br />$150.00. <br />$45,000.00 <br />Removal & Replacement of B6ick <br />Sidewalk <br />SY <br />$70.00 <br />$0.00 <br />Curb Replacement <br />LF <br />$70.00 <br />$0.00 <br />Rockwall Removal & Replacement <br />SY <br />$100.00 <br />$0.00 <br />Compaction of Road Sub Grade' <br />CY <br />$200.00 <br />$0.00 <br />Resurface Asphalt Pavement <br />SY <br />$90.00 <br />$0.00 <br />Seeding <br />SY <br />36679 <br />$0.75 <br />$27,509.25 <br />Sift Fence <br />LF <br />20600 <br />$3.00 <br />$61,800.00 <br />Tree Protection <br />LF <br />16600 <br />$3.00 <br />$49,800.00 <br />AS -BUILT DRAWINGS & CLOSE OUT <br />LS <br />1 <br />$6,000.00 <br />$6,000.00 <br />15% Contingency I <br />LS <br />1 <br />$413,969.29 <br />$413,969.29 <br />SUB TOTAL $1,067,398.54 <br />TOTAL COST $3,173,764.59 <br />NOTES <br />$220 Per foot <br />47 <br />