Browse
Search
Agenda - 05-17-2011- 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 05-17-2011
>
Agenda - 05-17-2011- 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 12:35:10 PM
Creation date
5/13/2011 3:16:41 PM
Metadata
Fields
Template:
BOCC
Date
5/17/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 05-17-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topic Area <br />Rogers. Road Small Area Plan <br />Rogers Road Community Enhancement <br />Work Accomplished <br />Work to be <br />Responsible <br />Approximate <br />Recommendation <br />Task Force Recommendation <br />to Date <br />Accomplished <br />Local <br />Cost <br />Govemment <br />Lore* <br />Other Topic <br />Areas <br />Reduce the odor from the landfill and <br />convenience center nowil Pursue a <br />Odor control masking <br />and neutralizing <br />No further <br />experimentation <br />L• OC <br />Odor Control <br />Expenditures <br />masking. agent atomization for landfill <br />agents tested, with <br />projected. <br />P. TOCH <br />-$17,365 <br />working face. Complete landfill leachate <br />inconclusive results. <br />sewer project to eliminate leachata storage <br />basin as soon as possible. Confer with <br />Leachate Sewer <br />Project complete. <br />Total Cost of <br />OWASA and utilize best management <br />Construction <br />Sewer <br />practices for the landfill industry to control <br />Complete (March <br />Protect - <br />odor and vermin_ For finance: lease the <br />2009) and Leachate <br />$458,937 <br />landfill areas to a private company that can <br />Basin Removed.(May <br />harvest the methane gas for profit and to <br />2009) <br />help in odor reduction. <br />Landfill Gas Project <br />Completion of design, <br />Agreement with UNC <br />permitting, and <br />(February 2009). <br />construction. <br />Design and <br />Projected completion <br />Permitlina Underway. <br />spring 2010. <br />Build a barrier wail (beginning with below <br />L OC <br />the surface of the ground) to Impede stop <br />rodents and other animals from leaving or <br />P: TOCH <br />entering the landfill and to decrease noise, <br />Improve air quality. Plant more trees and <br />other vegetation to obscure the view of the <br />landfill mount <br />Document In writing all meetings concerning <br />L OC, TOCH, <br />this neighborhood and have these <br />TOC <br />documents officially recorded and filed. <br />L -Lead, P - Participatory. OC —Orange County, TOCH— Town of Chapel Bill, TOC -Town. of Carrboro, TOTS —Town of Hillsborough, NCDOT =North Carolina Department of Transportation, CTCCS - Chapel Hill — <br />Carrboro City Schools. <br />W <br />Ln <br />
The URL can be used to link to this page
Your browser does not support the video tag.