Orange County NC Website
13 <br />Report of Landfill Ovmers Group/Landfill Neighbors Working Group <br />the University Railway will be eligible for long -term (up to 50 years), low- interest loans <br />from the landfill fiord to pay the costs of hooking up to water service. <br />3. The Landfill Owners Group will prepare and recommend a policy for adoption by the <br />Chapel Hill Town Council which will require loads of waste (MSW and Construction <br />.and Demolition waste) being brought to the Orange Regional Landfill to be covered. <br />Under the policy, loads which are not covered would be subject to fine. The fines would <br />become effective after a three mouth grace period. Non - commercial first -time offenders <br />should be offered the option of purchasing a tarp at the landfill in lieu of paying the fine. <br />4. The Landfill Owners Group will adopt a policy which requires loads of mulch leaving <br />the Orange Regional Landfill to be covered. The Landfill will make available for sale <br />tarps of various sizes for purchasers of mulch to cover their loads. This policy will <br />become effective after a three month grace period, during which time education will be <br />provided to mulch purchasers at the landfill. <br />5. The Landfill Owners Group will adopt a policy which doubles the minimum frequency <br />of litter pickup on roads suzzounding the Orange Regional Landfill. This will result in <br />litter pickup on Eubanks Road east of the landfill entrance at least twice weekly, on <br />Eubanks Road west of the landfill entrance at least six tunes annually, and on Rogers <br />Road at least eight times annually. Future modifications of these pickup frequencies <br />shall be made only by the Landfill Owners Group or its successor. <br />6. The Landfill Owners Group will adopt a policy governing construction at the Orange <br />Regional Landfill This policy will govern issues affecting neighboring residents, <br />including nighttime construction, blasting, and noise. The policy will identify ways to <br />mitigate or eliminate adverse effects on landfill neighbors, and will require all neighbors <br />(those living in the areas to be provided-with water and sewer service) to be.notified one <br />week in advance of the start of construction. Such notification shall include the <br />estimated duration of construction, and a description of any special construction activities <br />which may impact neighbors. Notification will, at a minim i include posting of signs <br />on the four roadway entrances into these neighborhoods (the north end of Millhouse <br />Road, both ends of Eubanks Road, and the south end of Rogers Road). <br />Under ordinary circumstances, the LOG and its contractors will avoid construction <br />between the hours of 11:00 pm and 6:00 am, and will provide for immediate notification <br />of neighbors when emergency circumstances dictate that construction. activities are <br />unavoidable during these hours. The LOG will ensure that any contractors carrying out <br />construction at the landffffi follow the Orange County noise ordinance. <br />7. The Working Group recommends that residents living-near the orange Regional <br />Landfill take initiative in identifiying perpetrators of illegal dumping near the landfill to <br />assist in successful prosecutions. Identification of vehicles, license tags, drivers, and/or <br />types of articles discarded should be made when possible. <br />