Browse
Search
Agenda - 05-03-2011 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 05-03-2011
>
Agenda - 05-03-2011 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2011 10:08:00 AM
Creation date
4/29/2011 10:07:31 AM
Metadata
Fields
Template:
BOCC
Date
5/3/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
Minutes 05-03-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE couNTY <br />BOARD of COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: May 3, 2011 <br />Action Agenda <br />Item No. <br />SUBJECT: Bus Route 420 (Hillsborough to Chapel Hill) Service Changes <br />DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No <br />ATTACHMENT~S~: INFORMATION CONTACT: <br />1. Current Route 420 Schedule Craig Benedict, 245-2592 <br />2. Pro osed Route 420 Schedule Mila Ve a, 245-2552 <br />PURPOSE: To: <br />• Receive an overview of Route 420 changes proposed by Triangle Transit; and <br />• Approve or comment on proposed changes to the midday service operated by <br />Qrange Public Transportation SUPT} and forward to Triangle Transit, <br />BACKGROUND: Route 420 is a Triangle Transit route operated by Chapel Hill Transit ~CHT} <br />during peak hours and UPT during midday. The route operates five days a week, Monday. <br />through Friday. Triangle Transit provides 100°/~ funding for the peak hours operation and 50°/0 <br />funding for the midday operation. The remaining 50°/o funding for the midday service is <br />provided by Qrange County, which equates to $50,900 annually. <br />Triangle Transit monitors and reviews routes performance system-wide. The minimum <br />performance standard is set at 75°/0 of the average systemwide ridership for regular commuting <br />routes. Any route for portion of the route} that falls below the 75°/a productivity standard is <br />subject for review and restructuring. In many cases a low performing service is reduced or <br />eliminated. Un the other hand, routes with productivity of 125°l0 of the system's average are <br />considered high performance routes and are potential candidates for service <br />increaselexpansion. <br />Ridership data shows that Route 420 has consistently strong performance during peak <br />commute} hours and low performance during midday. As a result, Triangle Transit is <br />proposing changes to the route that, if approved by the Triangle Transit Board, will become <br />effective as of August 15, 2011. The change process includes a public comment period. <br />Triangle Transit proposes the following changes: <br />• Peak service -add four round trips. The additional peak trips will result in 30-minute <br />frequency between Hillsborough and Chapel Hill during peak hours. Triangle Transit <br />provides 100% funding for the existing and proposed added peak hour trips. <br />• Midda~~ service -cut Triangle Transit funding for mid-day trips. Current midday service <br />consists of a total of four round trips between Hillsborough and Chapel Hill. Triangle <br />Transit and grange County each fund two midday trips. <br />
The URL can be used to link to this page
Your browser does not support the video tag.