Orange County NC Website
CHAPEL HILL - CARRSORO CITY SCHOOLS <br />CAPITAL INVESTMENTS PLAN 2011- 2021 <br />UNFUNDED - Major Projects <br />PROJECTS: <br />UNFUNDED MAJOR PROJECTS pg 1 of 2 <br />10 YEAR UNFUNDED CAPITAL PROJECTS <br />2011-12 I 012-13 I 2013-14 I 2014 5 I 015 6 I 2016 7 I 017 --18 I 018 9 1 019- 0 I 7wn-,yo I Tn�R <br />3 -3 <br />Abatement Projects <br />Phillips: Remove Asbestos Floor Tile <br />+; <br />265,000 <br />265,000 <br />Athletic Facilities: <br />CHHS: Stadkxn Synthetic Field <br />750,000 <br />750,000 <br />CHHS: Soccer Field Improvements <br />250,000 <br />250,000 <br />CHHS: Athletic Fields <br />150,000 <br />CHHS: Baseball field Balhroom/Concesslan Bid . <br />500,000 <br />500,000 <br />ECHHS: Stadium Synthetic Field <br />750,000 <br />750,000 <br />CHHSIECHHS: new stadium tracks <br />250,000 <br />Carboro Elementary: Mufti purpose field <br />125,000 <br />125,000 <br />Scruggs: Aedesc Fkrld <br />150,000 <br />150,000 <br />McDougle Mdl: Tennis Courts <br />250,000 <br />250,000 <br />Playfields(10): Provide Potable Water <br />120,000 <br />120,000 <br />Cafeterias: Kitrchen Equipment Replacements <br />150,000 <br />150,000 <br />150,000 <br />450,000 <br />ClassroomlBullding Improvements: <br />Carboro Eim: Auditorium lighlbWaccustics <br />100,000 <br />100,000 <br />Estes Hills: Lobby /Entrance Improvements <br />25,000 <br />25,000 <br />Seawall: Admin Building Improvements <br />50,000 <br />5D 000 <br />McDo le: Library carpet <br />30,000 <br />30,000 <br />Phillips: Science Classrooms Casework <br />75,000 <br />75,000 <br />Smith: Cafeteria Sound Panels <br />50,000 <br />50,000 <br />DoorsiliardwarelCano ies <br />Scro gs: Canopies-Mobile Units, other areas <br />175,000 <br />175,000 <br />Mechanical Systems: <br />Catrboro Elm: HVAC Digital Cpntrols <br />25,000 <br />25,000 <br />Ephesus: HVAC Digital Controls <br />45,000 <br />45,000 <br />Estes Hills: HVAC Digital Controls <br />25,000 <br />25,000 <br />Glenwood: HVAC Digital Controls <br />45,000 <br />45,000 <br />FP Graham: Replace Gym Heat Pumps <br />75,000 <br />75,000 <br />FP Graham: HVAC Digital Controls <br />25,000 <br />25,000 <br />Seawall: Replace 9 Heat Pumps In PODS <br />135,000 <br />135,000 <br />Seawall: HVAC Digital Controls <br />45,000 <br />45,000 <br />Culbreth: Replace 1997 Roof Top Units <br />300,000 <br />300,000 <br />Culbreth: Dud Replacement <br />250,000 <br />250,000 <br />Phillips: Replace Heat Pumps In 1990 Addition <br />150,000 <br />150,000 <br />ECHHS: 1996 Chiller Replacement <br />250,000 <br />250,000 <br />Lincoln Center. HVAC System Replacements <br />650,000 <br />650,000 <br />3 -3 <br />