Orange County NC Website
Hillsborough State Employees Credit Union <br />Stormwater Report ~ -'] <br />Project # 70994252 <br />Computer Model Input for Watershed Areas <br />Through the use of HydroCAD, many aspects of the effluent flow were analyzed. The program requires <br />certain input regarding the characteristics of the land. The input required is:• <br />1. Design Storm Information <br />a. Length of storm <br />b. Depth of rainfall • <br />e. Time increment for analysis (dt) <br />2. Time of Concentration <br />3. Composite Areas with Corresponding SCS Runoff Curve Numbers <br />esien forms <br />An SCS Type II 24 Hour rainfall distribution was assumed for the storm analysis, with 0.01-hour <br />increments. A rainfall of 3.00 inches was used for the one-yeaz storm analysis. For the 10-year stomp,-5.38 <br />inches of rainfall was used. <br />Time. of Concentration <br />The tune of concentration route was identified as the longest path that water would flow to reach the pond. <br />Each route was broken into twa segments: sheet flow and shallow concentrated flow. TR55 methods wtre <br />used to calculate the sheet and shallow concentrated flow times, through the HydroCAD program. • <br />Composite Areas and Correspondin¢ SCS Runoff Curve Nurr-bers <br />The composite areas were entered into HydroCAD using measurements taken from the design drawings. <br />The corresponding SCS curve numbers were selected based on the surface composition, and can be seen in <br />the HydroCAD reports included in Appendix A. <br />• Summary <br />After cazefuI consideration of the pre and post development conditions at the Hillsborough State <br />.-...:. <br />zp _ y - n; - with the Orange Gounty Inspections Department, Lan cape <br />- --- ` -' - =- ".Hit is ees Credit Unio -discussions <br />- <br />_- .. •- - <br />- ~_- ~ Arclutccts-`from--O'Brien- =Atkins, --aIId=after=ttaking _ _eoncexns~for.:_tha ~u~aunding _watershed into <br />consideration, the proposed-stormwater plan was-.developed_ Tfus-p~ari`in`coiporates-the-•existing ---_-- <br />stormwater structures and the addition of a new underground detention system. -. - <br />nR/O8/03 Page 2 <br />