Browse
Search
Agenda - 03-04-2004-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 03-04-2004
>
Agenda - 03-04-2004-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 9:58:13 AM
Creation date
4/18/2011 9:57:50 AM
Metadata
Fields
Template:
BOCC
Date
3/4/2004
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
ORD-2004-010 - PD-1-03 State Employees Credit Union Addition Rezoning & Class A Special Use Permit
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2004
RES-2004-011 2004 Rate Order Resolution for Cable Services in Unincorporated Orange Co (2)
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FiiIlsborough State Employees Credit Union <br />Stormwater Report //~ <br />Project # 70994252 ~ Y~ <br />Project Overview <br />The State Employee's Gredit union intends to increase the size of its facility and parking area at the <br />Hillsborough, North Carolina location at the corner of Old Hillsborough -Chapel HiII and Oakdale Roads. <br />The project will involve converting a new piece of land into a pazking azea with a small building to service <br />a new drive through teller system. <br />Methodology <br />Water Quantity <br />. - Tliis hydraulio study was preformed using HydroC-Ai)®6.-This-is a software package by-Applied - -. _... _ _-. <br />Microcomputer ~ Systems, which can be used to model a variety of watersheds, ponds and a <br />erea <br />Please refer to the attached summary (Appendix A) for the peak flows and water levels and to the <br />attached calculations for details. - <br />Water Quality <br />For nitrogen runoff- analysis, the two lots were combined and treated as one large area. The <br />nitrogen was calculated using method 1 from the Orange County Stormwater ordinance for lands <br />- within the Neuse River Basin. <br />Site Description <br />The existing credit union is on 2.26 acres, consisting of a building and pazking area that takes up most of <br />the site. A detention pond is located near Oakdale Road, which drains iota a culvert beneath Oakdale <br />Road. The new property is to the south of the existing building, consisting of a few small buildings, <br />driveways, fencing and a house. The new ]and will have a small building for new drive through tellers, and <br />additional parking. <br />Proposed Stormwater Management <br />The existing pond and stormwater system will remain in place, with the addition of only one yazd inlet. <br />___~_~____-__..__-_____The_quantity of sto_ rmwator through the existing system will increase slightly with the addition of sonic <br />-~ - - runoff from the new site. 'T'he pond- rs capable of handling-a-large-increase-in- quantitx while.~till.-do~3ni~_._. - ,-_:._.., ... <br />- the runoff from the site. The current pipe system can accommodate the slight increase in flow, but would - <br />not be able to -handle the runoff from the whole new property. Therefore a separate starmwater detention - . <br />system for the new development was designed_ <br />The new property will decrease runoff quantity to the predevelopment values through an underground <br />detention system beneath the proposed parking area. •This underground detention system will consist o€ <br />400' of 36" HDPE piping. <br />The outflow of the detention system will be controlled through the cap at the end of the pipes. A 5" pipe <br />will restrict the outflow in the two year storm to the pre-construction levels, and the cap will be open at the <br />top for free outflow is larger storm events. <br />- Because the post-development Nitrogen values will be less than 10 pounds per acre per year, the owners <br />plan to make a payment toward the wetland mitigation fund and. not implement any nutrient reduction <br />practices. The nitrogen calculations can be seen in Appendix B. <br />A small area will not be duected to the stormwater detention system because of the elevation differences. <br />This water will be directed to the effluent pipe fmm the detention system, and the' water will be directed to <br />- a rip-rap dissipater pad. The value of this flow has been taken into consideration in water quantity analysis. <br />08/08/03 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.