Browse
Search
Agenda - 03-04-2004-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 03-04-2004
>
Agenda - 03-04-2004-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 9:58:13 AM
Creation date
4/18/2011 9:57:50 AM
Metadata
Fields
Template:
BOCC
Date
3/4/2004
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
ORD-2004-010 - PD-1-03 State Employees Credit Union Addition Rezoning & Class A Special Use Permit
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2004
RES-2004-011 2004 Rate Order Resolution for Cable Services in Unincorporated Orange Co (2)
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town <br />of <br />ills <br />S'.s,ce v: <br />October 27, 2003 ~ °~ <br />Re: State Employees' Credit Union <br />'ve-U Facili and Ex ansion/Renovation <br />Dn P tY P <br />2313 Old NC 86 <br />Water & Sewer Review <br />APPROVED AS NOTED <br />Mr. Elmaz D. Kapfer, PE <br />TTTAN -ATLANTIC GROUP <br />5240 Green's Dairy Road <br />ei~~1~ ~ <br />Dear Mr. Kapfer: <br />I have reviewed the water and sewer utilities plans for the State Employees' Credit Union Drive- <br />Up Facility and Expansion/Renovation dated August 7, 2003, and they are hereby Approved as <br />Noted. The following comments must be addressed prior to construction (all comments are in <br />reference to Sheet LA-3}~: ~ .- . <br />1. Bacldlow Prevention: A DCVA backflow preventer must be installed immediately <br />following the water meter, above-ground with an insulated box cover,. Annual testing will <br />be required of the customer, with testing data submitted to the Town. - <br />2. Sanitary Sewer Profile: The length and percent grade of each section of gravity sewer <br />- must be shown on the sanitary sewer profile. <br />3. Sewer Bore & Jack/Encasement Pipe: The encasement pipe must be a minimum of 12" <br />to provide adequate clearance far the 8" DI sewer pipe joints: Also, DIP is noted for the <br />__ - <br />- -: <br />---- ------.--------encasemen$ pike, however; steel encasemgnt pips is acGe to e <br />.~_P _-~ __:.: <br />- -- -- <br />4. '4~Vater & Sewer Connection Fees: An invoice is attached, which details the fees <br />required for connection to the Town water and sewer system. The Water Capital <br />Facilities Fee is not assessed since the existing water service will be utilized. <br />Further instructions on the Town requirements during and after construction can be found in the <br />"Checklist for Approval and Acceptance of Utilities Projects", which is available from my office <br />and on the Town website (www ci.hillsborough.nc.us). The permit application to NCDWQ for <br />the sewer extension should be prepared for signature by the Town Manager, Eric J. Peterson. <br />The fillsborough Utility Inspector (Russell Lloyd, 919-201-1432) should be notified prier to <br />construction, and prior to any testing of the water and sewer facilities to be installed. As always, <br />you may notify my office if you are unable to reach the inspector. - <br />101 East grange Street • P.O. Box 429 • Hillsborough, North Carolina 27278 <br />0~0_~2o,ioon. ~ ,-OJO.RAA,9?On <br />
The URL can be used to link to this page
Your browser does not support the video tag.