Browse
Search
Agenda - 03-04-2004-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 03-04-2004
>
Agenda - 03-04-2004-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 9:58:13 AM
Creation date
4/18/2011 9:57:50 AM
Metadata
Fields
Template:
BOCC
Date
3/4/2004
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
ORD-2004-010 - PD-1-03 State Employees Credit Union Addition Rezoning & Class A Special Use Permit
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2004
RES-2004-011 2004 Rate Order Resolution for Cable Services in Unincorporated Orange Co (2)
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(.O'BRIENIATKINS Associates, P.A. <br />Architecture/Engineering <br />Landscape Architecture/Planning <br />Interior Design <br />P.O. Box 12037 <br />Research Triangle Park, NC 27709 <br />9191941-9000 <br />TD: Larry Bennett-. LT Bennett Construction <br />Robert -Bennett Landscape and Maintenance <br />~ . THE FOLLOWING WAS NOTED: <br />Parking Lot Expansion <br />FIELD REPORT <br />DATE; 10!29!03 JOB NO. <br />2001092 <br />PROJECT <br />Wake Farest Operations'Center -parking fot <br />LOCATION <br />3110 Jake Forest Road <br />CONTRACTOR OWNER <br />LT Bennett SECU <br />WEATHER TEMP TIME <br />Fair 68 8:30 am <br />Robert Bennett <br />Jay Smith, O/A <br />1. Redbuds in middle parking aisle and southern edge flagged, follow up on condition in <br />spring. Specimens requiring replacement to be finalized in spring at 1 yr inspection. - <br />2. Grass is 90-95% established in all disturbed areas, landscape crew has over~seeded <br />where necessary. <br />3. Adjust rip-rap at entry of Bio-Retention Area to protect the left bank. <br />4. Relocate shrubs from outflow of emergency spillway. <br />5. Adjust rip-rap in spillway necessary to protect outflow point. <br />;- - 6 ~ uirg_ini~ M~nolia,_at north of parking lot is flagged, follow up condition in spring. <br />---- -=-7r -.Some=Qf_t6~_gLound cover at edges cftbe-beds appear to be killed. by overspray_ .from _ <br />weed killer applied by grounds maintenance crew:. --~ - - -~- ~ ~ ~ _ ~ '~_` <br />8. Temporary irrigation system to be drained to protect during winter. System to be <br />removed at end of 1yr warranty period. <br />All punch list items were corrected from previous site inspection.. <br />CC: all attending <br />Bill O'Brien <br />Jay Smith <br />Robert Hall <br />Patty Munns <br />Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.