Orange County NC Website
t <br />~~~ <br />8. STATE PERMITS REQUIRED <br />_ 1, Does tha project involve the mining of earth products? <br />-, <br />• If sa, .how many cubi feet of material are expected to be <br />excavated? ~ ~ <br />Has an application for a Mining Permit been submitted to <br />NCDRCD? ~~ 0'~' <br />Please attach map indicating expected extent of proposed <br />act~v~ty ._.._....... _ ._ .. .... _ .-_-_ <br />2. <br />Does the project involve generation or storage of <br />hazardous or toxic wastes, as identified by the <br />Environmental Protection Agency? (A listing of all <br />hazardous materials is available from the Planning <br />Department ) Nt7•~ ~' ~ ' <br />Describe the wastes to be generated. <br />How much material is expected to be generated per month? <br />Will any material be treated onsite? _ <br />Volume?~ <br />Will any material-be stored onsite? <br />. _, <br />-. _ __ --- <br />._- _ -- - -------- - -- ------------ ._._-.~._Vo.l-ume.?-- - -~r _ -- <br />Where will disposal of the material take place? <br />How will materials be transported to the disposal site? <br />What measures are proposed to protect water quality and <br />air quality in case of spills? <br />