Browse
Search
Agenda - 03-04-2004-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 03-04-2004
>
Agenda - 03-04-2004-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 9:58:13 AM
Creation date
4/18/2011 9:57:50 AM
Metadata
Fields
Template:
BOCC
Date
3/4/2004
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
ORD-2004-010 - PD-1-03 State Employees Credit Union Addition Rezoning & Class A Special Use Permit
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2004
RES-2004-011 2004 Rate Order Resolution for Cable Services in Unincorporated Orange Co (2)
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lanes, Volumes, Timings ~ ~G~ - , <br />3: Oakdale Road & Old 86 12l "` <br /> <br />Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />v/c Ratio 0.63 0.09 0.35 0.42 0.04 0,75 <br />Uniform Delay, d1 17.4 5.4 7.8 8.1 6.4 10.0 <br />Decay 20.1 11.4 10.3 9.4 8.1 11.8 <br />LOS C B B A A B <br />Approach Delay 20.1 11.4 9.5 11.7 <br />Approach LOS C B A B <br />Queue Length 50th (ft) 74 4 19 83 3 176 <br />Queue Length 95th (ft) 239 32 68 199 13 432 <br />Intemai Link Dist (ft) 194 1312 179 576 <br />50th Up Block Time (%) <br />95th Up Block Time (%) 17% 9% <br />Tum Bay Length (ft) <br />50th Bay Block Time <br />95th Bay Block Time <br />Queuing Penalty (veh) 24 20 <br />Intersection Summa <br />Area Type: Other . " <br />Cycle Length: 132.7 <br />Actuated Cycle Length: 65.1 <br />Natural Cycle: 60 <br />Control Type: Actuated-Uncoordinated <br />Maximum v/c Ratio: 0.75 <br />Intersection Signal Delay: 12.5 Intersection LOS: B <br />Intersection Capacity Utilization 79.5% ICU Level of Service C <br />Splits and Phases: 3: Oakdale Road & Old 86 <br />m2 ""'N' 04 <br /> ~; <br />~~~; <br />®6 ,, <br />m8 <br />r <br />5: <br />.., .:, <br />SECU Expansion -Hillsborough 11/21/2003 Future (2003) PM Peak Hour Synchro 5 Report <br />With One Additional Window Page 2 <br />RAM EYKRALE-ST51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.